Skip to code content (skip section selection)
Compare to:
Milan Overview
Milan, IL Code of Ordinances
VILLAGE CODE OF MILAN, IL
ORDINANCES PENDING REVIEW FOR CODIFICATION
ADOPTING ORDINANCE
TITLE 1 ADMINISTRATION
TITLE 2 BOARDS, COMMISSIONS AND COMMITTEES
TITLE 3 FINANCES AND TAXATION
TITLE 4 BUSINESS AND LICENSE REGULATIONS
TITLE 5 HEALTH, SANITATION AND ENVIRONMENT
TITLE 6 POLICE AND PUBLIC SAFETY
TITLE 7 MOTOR VEHICLES AND TRAFFIC
TITLE 8 PUBLIC WAYS AND PROPERTY
TITLE 9 WATER AND WASTEWATER
TITLE 10 BUILDING AND DEVELOPMENT
TITLE 11 ZONING REGULATIONS
TITLE 12 SUBDIVISION REGULATIONS
TITLE 13 CABLE SERVICES
CHAPTER 5
PLUMBING REGULATIONS
SECTION:
10-5-1: Plumbing Inspector
10-5-2: Regulations Adopted
10-5-3: Interpretation
10-5-4: Permit Requirements
10-5-5: Fees And Deposit
10-5-6: Inspections; Tests; Certificate Of Approval
10-5-7: Rules And Regulations For Protection Of Water Supply System
10-5-8: Safe And Sanitary Plumbing System
10-5-9: Service Lines
10-5-10: Yard Hydrants, Sprinkling Plugs And Sill Cocks
10-5-11: Obstructing System Prohibited
10-5-12: Extension Of Sewer Service
10-5-13: Discontinuance Of Water Use And Service
10-5-14: Enforcement
10-5-15: Nonliability Of Village
10-5-16: Penalty
10-5-1: PLUMBING INSPECTOR:
There shall be appointed a plumbing inspector, pursuant to the provisions of section 1-6E-4 of this code, who shall be a licensed plumber in the state of Illinois. (Ord. 1570, 9-17-2012; amd. Ord. 1776, 11-6-2023)
10-5-2: REGULATIONS ADOPTED:
   A.   Adoption Of Code: There is hereby adopted as a portion of the plumbing regulations for the village, the international plumbing code, 2014 edition, adopted by the village of Milan, Illinois, and the Illinois plumbing code, adopted by the Illinois department of public health, effective February 1, 2004, and all amendments made and to be made subsequent to February 1, 2004. One copy of said international plumbing code and Illinois plumbing code are on file in the office of the village clerk and are available for public use, inspection and examination. (Ord. 1570, 9-17-2012; amd. Ord. 1776, 11-6-2023)
10-5-3: INTERPRETATION:
   A.   In the event of a conflict in the interpretation of the provisions of the international plumbing code with the provisions of the Illinois plumbing code and/or subsequent amendments thereto, then the provisions of the Illinois plumbing code shall govern.
   B.   In the event of a conflict in the interpretation of the international plumbing code and/or Illinois plumbing code, as amended from time to time hereafter, with the provisions of subsection 10-5-2A1 of this chapter, the provisions of said subsection 10-5-2A1 shall govern.
   C.   Where reference is made in the Illinois plumbing code adopted in subsection 10-5-2A of this chapter to the word "department", said word refers to the village plumbing inspector and does not refer to the department of public health of the state of Illinois.
   D.   All references to the "plumbing board" herein contained refer to the "board of appeals" created by the provisions of section 10-1B-1 of this title, which board shall have all of the powers and duties conferred upon the plumbing board in the international plumbing code as well as those powers as set forth in this chapter. (Ord. 1570, 9-17-2012; amd. Ord. 1776, 11-6-2023)
10-5-4: PERMIT REQUIREMENTS:
   A.   Permit Required: No person, firm, or corporation shall engage in or perform "plumbing" in the village without first obtaining a permit from the plumbing inspector.
   B.   Eligibility For Permit:
      1.   Permits shall be granted only to those persons eligible under the provisions of "an act of the Illinois legislature in relation to the licensing and regulation of plumbers, to repeal a certain act therein named, and to prescribe penalties for the violation thereof", approved May 1, 1986.
      2.   In order to be eligible to obtain a permit, any person, firm or corporation engaging in or performing plumbing as a licensed plumber shall register as such in the office of the plumbing inspector, furnishing satisfactory proof that such person is duly licensed by the state of Illinois
   C.   Issuance To Owners Of Single-Family Dwellings: Any permit required by this chapter may be issued to any person to do any work regulated by this chapter in a single-family dwelling used exclusively for living purposes, including the usual accessory buildings and quarters in connection with such buildings; provided, that the person is the bona fide owner of such dwelling, and that the same is occupied by said owner, and that said owner shall personally purchase all material and perform all labor in connection therewith; and provided, that all workmanship methods and materials shall meet the requirements of these plumbing regulations.
   D.   Plans And Specifications: No permit shall be issued until plans and specifications showing the proposed work in necessary detail have been submitted to the plumbing inspector, and it has been determined from examination of such plans and specifications that they gave assurance that the work will conform to the provisions of this chapter. If a permit is denied, the applicant may submit revised plans and specifications without payment of an additional fee. If, in the course of work, it is found necessary to make any change from the plans and specifications on which a permit has been issued, amended plans and specifications shall be submitted, and a supplementary permit, subject to the same conditions applicable to original application for permit, shall be obtained to cover the change.
   E.   Expiration Of Permit; Renewal: Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within one hundred eighty (180) days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of one hundred eighty (180) days after the time the work is commenced. The building official is authorized to grant, in writing, one or more extensions of time, for periods not more than one hundred eighty (180) days each. The extension shall be requested in writing and justifiable cause demonstrated.
   F.   Correction Of Errors: The issuance of a permit based on plans and specifications shall not prevent the plumbing inspector from thereafter requiring the correction of errors in said plans and specifications or from preventing construction operations being carried on thereunder when in violation of these plumbing regulations or any other ordinance or from revoking any certificate of approval when issued in error.
   G.   Exemptions From Permit: No permit shall be required in the case of any repair work as follows: the stopping of leaks in drainpipes or soil, waste, or vent pipes; provided, however, that should any trap, drainpipe, or soil, waste, or vent pipe be or become defective and it becomes necessary to remove and replace the same with new material in any part or parts, the same shall be considered as new work, and a permit shall be procured and inspection shall be made as herein provided. No permit shall be required for the clearing of stoppage or the repairing of leaks in pipes, valves, or fixtures, when such repairs do not involve or require the replacement or rearrangement of valves, pipes, or fixtures. (Ord. 1570, 9-17-2012; amd. Ord. 1776, 11-6-2023)
10-5-5: FEES AND DEPOSIT:
A.   Fees:
   1.   Permits: Application for permit shall be accompanied by the appropriate fee in accordance with the following schedule:
 
Each sewer connection
$25.00
Each water connection
25.00
Water main taps
25.00
Each roof drain run inside of buildings and connected to the village storm drains
12.00
Gas piping
25.00
Lawn sprinkler
25.00
RPZ/cross connection
25.00
 
   2.   Water Heaters And Softeners: The fee for the installation, replacement or moving of all domestic hot water heaters, domestic hot water storage tanks, range boilers, and all domestic hot water appliances pertaining to tapping of water mains shall be at the rate of twelve dollars ($12.00) per service. All repair jobs, changing or replacing of each individual plumbing fixture shall be twelve dollars ($12.00) for each opening. A special fee for the installation of water softeners shall be twelve dollars ($12.00) to cover the cost of inspection time.
   3.   Inspections:
 
Inspections outside of normal business hours (minimum charge 2 hours)
$50.00 per hour1
Reinspection fees assessed under provisions of section 304e and 702c
50.00 per hour1
Inspections for which no fee is specifically indicated (minimum charge 1/2 hour)
50.00 per hour1
Additional plan review required by changes, additions, or revisions to approved plans (minimum charge 1/2 hour)
50.00 per hour1
For use of outside consultants for plan checking and inspections, or both
Actual costs2
Notes:
1.   Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved.
2.   Actual costs include administrative and overhead costs.
 
(Ord. 1570, 9-17-2012; amd. Ord. 1776, 11-6-2023)
Loading...