CHAPTER 156: STORMWATER: POST-CONSTRUCTION MANAGEMENT
Section
General Provisions
   156.001   Findings of fact
   156.002   Purpose
   156.003   Applicability
   156.004   Compatibility with other permit and ordinance requirements
   156.005   Development of a Best Management Practices Manual (BMP)
   156.006   Definitions
Permit Procedures and Requirements
   156.020   Permit required
   156.021   Application requirements
   156.022   Application review fees
   156.023   Application procedure
   156.024   Permit duration
Waivers to Stormwater Management Requirements
   156.040   Waivers for providing stormwater management
General Performance Criteria for Stormwater Management
   156.050   Stormwater criteria
Basic Stormwater Management Design Criteria
   156.060   Minimum control requirements
   156.061   Site design feasibility
   156.062   Conveyance issues
   156.063   Landscaping plans required
   156.064   Maintenance agreements
   156.065   Non-structural stormwater practice
Requirements for Stormwater Management Plan Approval
   156.080   SWMPL required for all developments
   156.081   SWMPL requirements
   156.082   Performance security
Construction Inspection
   156.090   Notice of construction commencement
   156.091   As-built plans
   156.092   Landscaping and stabilization requirements
Maintenance and Repair of Stormwater Facilities
   156.100   Maintenance easement
   156.101   Maintenance covenants
   156.102   Dedication for maintenance
   156.103   Requirements for maintenance covenant
   156.104   Inspection of SWMPRs
   156.105   Right-of-entry for inspection
   156.106   Records of installation and maintenance activities
   156.107   Failure to maintain practices
Enforcement and Penalties
   156.120   Violations
   156.121   Notice of violation (NOV)
   156.122   Stop work orders
   156.123   All other remedies and injunctive relief
   156.124   Lien rights
   156.125   Appeal procedures
 
   156.999   Penalty
Cross-reference:
   Stormwater: Illicit Discharges and Connections, see Ch. 152