§ 156.062 CONVEYANCE ISSUES.
   (A)   All SWMPLs shall be designed to convey stormwater to allow for the removal of pollutants and reduction in flow volumes and velocities. This shall include, but not be limited to:
      (1)   Maximizing flow paths from inflow points to outflow points;
      (2)   Protection of inlet and outfall structures;
      (3)   Elimination of erosive flow velocities; and
      (4)   Providing underdrain systems, where applicable.
   (B)   The BMP Manual shall provide detailed guidance on the requirements for conveyance for each of the approved SWMPRs.
(Ord. passed 4-30-2013)