(A) SWMPRs for a site shall be chosen based on the physical conditions of the site. Among the factors that should be considered:
(1) Topography;
(2) Maximum drainage area;
(3) Depth to water table;
(4) Soils; depth to rock;
(5) Slopes;
(6) Terrain;
(7) Location in relation to environmentally-sensitive features.
(B) Applicants shall consult the BMP manual for guidance on the factors that determine site design feasibility when selecting a SWMPR.
(Ord. passed 4-30-2013)