§ 156.061 SITE DESIGN FEASIBILITY.
   (A)   SWMPRs for a site shall be chosen based on the physical conditions of the site. Among the factors that should be considered:
      (1)   Topography;
      (2)   Maximum drainage area;
      (3)   Depth to water table;
      (4)   Soils; depth to rock;
      (5)   Slopes;
      (6)   Terrain;
      (7)   Location in relation to environmentally-sensitive features.
   (B)   Applicants shall consult the BMP manual for guidance on the factors that determine site design feasibility when selecting a SWMPR.
(Ord. passed 4-30-2013)