Loading...
(A) A cable operator shall not be required to extend more than 1,000 feet from the existing cable service, as measured from the extremity of the system nearest to the unserved area.
(B) A newly installed subscriber shall not be assessed or apportioned the cost for installation, except for the usual and normal connection fees paid by subscribers, so long as the system expansion is technically feasible.
(Prior Code, § 13.20.320) (Ord. 96-13.20, passed - -1996)
(A) A cable operator shall construct, operate, maintain, repair, remove, replace or restore the cable system in strict compliance with all current technical codes adopted by the town, the state or the United States which are customary to the cable television industry.
(B) The codes referred to specifically include, but are not limited to, construction, fire, safety and zoning codes.
(Prior Code, § 13.20.340) (Ord. 96-13.20, passed - -1996)
Loading...