16.34.080 Changes in Base Flood Elevations.
   Within six months of information becoming available to the director of a change of base flood elevation within the City, the director shall submit, or cause an applicant for a building permit to submit, the technical or scientific data of that change to FEMA for a letter of map revision.
(Ord. 2370 §6)