15.36.250 Permits authorizing the initial connection of premises located in that portion of the unincorporated territory of the county of Butte within the Chico Sphere of Influence to the city sewer system by way of a connection directly to the water pollution control plant or by a connection to a sewerage collection system owned by a public agency other than the city.
A permit authorizing the initial connection of premises located in that portion of the unincorporated territory of the county of Butte within the Chico Sphere of Influence to the sewer system by way of a connection directly to the water pollution control plant or by way of a connection to a sewerage collection system owned by a public agency other than the city shall be issued by the director if, following the filing of an application for such permit in the manner hereinafter provided by this chapter, the director determines that all of the following conditions have been met:
A. The type and density of any proposed development on the premises are consistent with the Chico General Plan; and
B. All water pollution control plant capacity fees assessed and levied pursuant to the provisions of this chapter have been paid.
(Ord. 1735 §1 (part), Ord. 1971 §8, Ord. 2068 §4, Ord. 2364 §278)