Loading...
The registered design professional shall submit to the building commissioner two complete sets of signed and sealed construction documents for the alternative engineered design. The construction documents shall include floor plans and a riser diagram of the work. Where appropriate, the construction documents shall indicate the direction of flow, all pipe sizes, grade of horizontal piping, loading, and location of fixtures and appliances.
(Amend Coun. J. 3-5-03, p. 104990, § 48; Amend Coun. J. 11-13-07, p. 14999, Art. II, § 1)
Where the building commissioner determines that the alternative engineered design conforms to the intent of this chapter, the plumbing system shall be approved. If the alternative engineered design is not approved, the building commissioner shall notify the registered design professional in writing, stating the reasons therefor.
(Amend Coun. J. 3-5-03, p. 104990, § 48; Amend Coun. J. 11-13-07, p. 14999, Art. II, § 1)
(Added Coun. J. 3-27-02, p. 82090, § 2; Amend Coun. J. 3-5-03, p. 104990, § 48; Amend Coun. J. 11-8-12, p. 38872, § 330; Amend Coun. J. 10-14-21, p. 37722, Art. I, § 2)
Loading...