Loading...
The design, documentation, inspection, testing and approval of an alternative engineered design plumbing system shall comply with Sections 18-29-105.4.1 through 18-29-105.4.6.
An alternative engineered design shall conform to the intent of the provisions of this chapter and shall provide an equivalent level of quality, strength, effectiveness, durability and safety. Material, equipment or components shall be designed and installed in accordance with the manufacturer's installation instructions.
The registered design professional shall submit to the building commissioner two complete sets of signed and sealed construction documents for the alternative engineered design. The construction documents shall include floor plans and a riser diagram of the work. Where appropriate, the construction documents shall indicate the direction of flow, all pipe sizes, grade of horizontal piping, loading, and location of fixtures and appliances.
(Amend Coun. J. 3-5-03, p. 104990, § 48; Amend Coun. J. 11-13-07, p. 14999, Art. II, § 1)
Where the building commissioner determines that the alternative engineered design conforms to the intent of this chapter, the plumbing system shall be approved. If the alternative engineered design is not approved, the building commissioner shall notify the registered design professional in writing, stating the reasons therefor.
(Amend Coun. J. 3-5-03, p. 104990, § 48; Amend Coun. J. 11-13-07, p. 14999, Art. II, § 1)
Loading...