Skip to code content (skip section selection)
Compare to:

You are viewing an archived code

13-96-1150  Permits required.
   It shall be unlawful to proceed with the construction, installation, enlargement or alteration of a shooting range facility without first obtaining a permit from the building commissioner and other required departments.
   The permit fee for the initial installation and inspection shall be in the amount required by Section 13-32-310.
   The permit application shall include drawings and documents that fully describe all features of the shooting range facility and the shooting range, the construction, the installed equipment and all required ballistic safety features, along with all supporting documents to fully describe the building, all appurtenances and the intended caliber of ballistics.
(Added Coun. J. 7-6-11, p. 3073, § 8)