CHAPTER 1042
Water and Sewer Service Development Procedures
  
1042.01   Summary of procedures.
1042.02   Preliminary plans.
1042.03   Requirements for detail plans.
1042.04   Performance bonds.
1042.05   Construction.
1042.06   Inspections.
1042.07   Maintenance bonds.
1042.08   Procedures for "as built" drawings.
1042.09   Format for detail plans.
1042.10   Format for "as built" drawings.
1042.11   Drywells.
1042.99   Penalty.
 
CROSS REFERENCES
Compulsory water and sewer connections - see Ohio R.C. 729.06
Management and control of sewerage system - see Ohio R.C. 729.50
Regulations to control house sewers and connections - see Ohio R.C. 729.51
Management and control of waterworks - see Ohio R.C. 735.28 et seq.
Water rates for users outside corporate limits - see Ohio R.C. 743.13
Responsibility of Manager re construction of sewerage system - see ADM. 232.01 
Prosecutions for theft of utilities - see GEN. OFF. 642.26 
Polluting and diverting watercourses - see GEN. OFF. 660.04