1042.08 PROCEDURES FOR "AS BUILT" DRAWINGS.
   (a)   "As built" information and changes shall be made on the original linen by the engineer or developer.
   (b)   Two sets of "as built" paper prints shall be submitted to the Department of Service for review.
   (c)   The engineer or developer will be notified of acceptance or corrections by the Department.
    
    (d)   One set of corrected "as built" paper prints shall be submitted to the Department for rechecking.
   (e)   Upon approval of "as built" drawings, linen or film type drawings which are capable of reproduction shall be submitted to the Department for permanent records.
(Ord. 9-87. Passed 3-9-87.)