All surface mining operations that propose off-channel excavations extending below the groundwater level shall develop and maintain a groundwater monitoring program consisting of two (2) components: water level measurements and water quality testing. A groundwater level monitoring program shall be initiated at least six (6) months prior to the removal of overburden. At a minimum, the groundwater level monitoring program shall consist of three (3) monitoring wells, with at least one well upgradient of the wet pit and one well downgradient of the wet pit. Monitoring programs for proposed mining areas exceeding one hundred (100) acres (total proposed mining area over the life of the project) shall include one additional well for each one hundred (100) acres of wet pit mining. Therefore, wet pit mining areas of one to ninety-nine (99) acres would require three (3) wells, one hundred (100) to one hundred ninety-nine (199) acres would require four (4) wells, two hundred (200) to two hundred ninety-nine (299) acres would require five (5) wells, and so on. These wells shall be distributed through the vicinity of the wet pit mining area and used for groundwater level measurements. Groundwater levels shall be collected from the monitoring wells on a quarterly basis for six (6) months prior to mining and for the duration of the mining period. All wellheads shall be surveyed with horizontal and vertical control to allow calculation of groundwater elevations and development of groundwater contour maps. Groundwater levels shall be measured with an accuracy of plus or minus 0.01 foot, at minimum.
Water quality in the vicinity of each active wet pit mining location shall be evaluated by analyzing samples from selected monitoring wells (one upgradient and one downgradient) and wet pit surface water sampling locations. Since mining may be conducted in phases over a relatively long period of time, pit boundaries may change with time. Selection, and installation if necessary, of downgradient monitoring wells, which would be critical to adequately characterize the groundwater quality in the vicinity of the wet pits, shall be submitted by the operator for review and approval by the County. The selected monitoring wells shall be installed and sampled at least six (6) months prior to the removal of overburden. The downgradient wells shall be located as near to the active wet pit mining areas as is practical. The upgradient wells shall be located an adequate distance from the proposed mining area to ensure that the effect of the wet pit on water quality in the well would be negligible. The water samples from the wet pit shall be collected in a manner so as to ensure that they are representative of water quality within the wet pit. The minimum sampling schedule and required analyses are described below.
(a) Groundwater level and pit water surface level measurements shall be performed quarterly in all wells for the duration of mining and reclamation.
(b) For monitoring the groundwater quality of proposed wet pit mining, sample collection and analysis of physical, chemical, and biological constituents shall be conducted according to the following specifications:
(1) Prior to the removal of overburden. One upgradient and one downgradient well shall be sampled at least six (6) months prior to the removal of overburden and again at the start of excavation. The samples shall, at minimum, be analyzed for general minerals; inorganics; nitrates; total petroleum hydrocarbons (TPH) as diesel and motor oil, benzene, toluene, ethylbenzene, and xylenes (BTEX); pesticides (EPA 8140 and 8150); and coliform (with E. coli confirmation).
(2) During wet pit mining and active reclamation. The wet pit shall be sampled semiannually for the duration of mining and active reclamation. The samples shall, at minimum, be analyzed for general minerals; inorganics; nitrates; TPH as diesel and motor oil, BTEX; pesticides (EPA 8140 and 8150); and coliform (with E. coli confirmation).
One upgradient and one downgradient well shall be analyzed, at minimum, for general minerals; inorganics; nitrates; TPH as diesel and motor oil, BTEX; pesticides (EPA 8140 and 8150); and coliform (with E. coil confirmation). The wells shall be sampled according to the following schedule: semiannually for the first two (2) years, and annually every year thereafter.
(3) After active reclamation. One year after all heavy equipment work has been completed in the vicinity of the pit, the TPH and BTEX analyses may be discontinued. The wet pit and one upgradient and one downgradient well shall be sampled and analyzed for pH; temperature; nutrients (phosphorous and nitrogen); total dissolved solids; total coliform (with E. coli confirmation); and biological oxygen demand. This monitoring shall be conducted every two (2) years for a ten (10)-year period after completion of reclamation.
A report to the Agency and Department of Environmental Health shall be submitted within thirty (30) days of the required groundwater testing.
Additional tests and analysis shall be required only if a new condition is recognized that may threaten water quality or if the results of previous tests fall outside allowable ranges. If at any time during the monitoring period, testing results indicate that sampling parameters exceed Maximum Contaminant Levels (MCLs), as reported in the California Code of Regulations, or established background levels, a qualified professional shall evaluate potential sources of the contaminants. The evaluation shall determine the source and process of migration (surface or subsurface) of the contaminants. A report shall be submitted to the regulatory agencies (the Agency, Yolo County Department of Environmental Health, the Central Valley Regional Water Quality Control Board, and the U.S. Environmental Protection Agency) which identified, the source of the detected contaminants and specifies remedial actions to be implemented by the operator for corrective action. If it is determined that the source of water quality degradation is off-site, and the County and the RWQCB are in agreement with this conclusion, the operator shall not be responsible for corrective action.
If corrective action is ineffective or infeasible, the responsible party must provide reparation to affected well owners, either by treatment of water at the wellhead or by procurement of an alternate water supply.
If, at the completion of the mining and reclamation period, water quality has not been impacted, all monitoring wells shall be destroyed in accordance with the California Department of Water Resources Well Standards. If the County, landowner, or other agency wishes to maintain the wells for future water resources evaluation, selected wells may be preserved for this use. Monitoring wells may remain useful for post-mining land uses.
The County may retain appropriate staff or a contract consultant to provide third party critical review of all hydrologic reports related to monitoring.
(§ 1, Ord. 1190, eff. September 5, 1996; as amended by Ord. 1518, eff. February 13, 2020)
All surface mining operations shall complement the preservation and enhancement measures in the Yolo County Habitat Conservation Plan (HCP). Mining operators with lands designated as having a moderate to high potential for use as mitigation areas in the HCP shall be encouraged to participate in the Developer HCP Participation Options, including use of lands as mitigation sites.
(§ 1, Ord. 1190, eff. September 5, 1996)
Trucks accessing a mining site to pick up a load, or leaving a mining site to deliver a load, are restricted to the approved/designated haul routes identified in the operator’s permit which applies to the route taken from the mining site access/ driveway to a state/federal highway. If a truck subsequently exits the state/federal highway while within Yolo County, this too may only occur on an approved/designate haul route. This applies to all truck trips serving the mining site, unless making a local delivery. Those portions of designated truck haul routes that include County-maintained roads shall be posted as such, in accordance with the Public Works Department, to facilitate law enforcement and public safety. Private truck haul routes or conveyors shall be used to transport material within the mining site, in order to reduce impacts to public roads.
(§ 1, Ord. 1190, eff. September 5, 1996; as amended by Ord. 1518, eff. February 13, 2020)
Prior to handling threshold quantities of hazardous materials (fifty-five (55) gallons, five hundred (500) pounds, or two hundred (200) cubic feet of compressed gas) or generating any amount of hazardous waste on site, a Hazardous Materials Business Plan must be completed and submitted to Yolo County Environmental Health by the operator through the California Environmental Reporting System (CERS). In addition, prior to above ground storage tanks (AST) or containers with cumulative storage capacity greater than one thousand three hundred twenty (1,320) gallons of petroleum products being present at the facility, a Spill Prevention Countermeasure Contingency (SPCC) Plan must be prepared, implemented, and retained on site.
(Ord. 1518, eff. February 13, 2020)
Each mining area to be reclaimed to a permanent lake as part of each approved long-range mining plan shall be evaluated annually by the operator for five (5) years after the pit fills with groundwater with an intensive fish mercury monitoring program described in Section 10-5.517 of the Reclamation Ordinance.
(Ord. 1518, eff. February 13, 2020)
From 6:00 a.m. to 6:00 p.m., noise levels shall not exceed an average noise level equivalent (Leq) of eighty (80) decibels (dBA) measured at the property boundaries of the site. However, noise levels shall not exceed an average noise level equivalent (Leq) of sixty (60) decibels (dbA) for any nearby off-site residences or other noise-sensitive land uses.
From 6:00 p.m. to 6:00 a.m., noise levels shall not exceed an average noise level equivalent (Leq) of sixty-five (65) decibels (dBA) measured at the property boundaries of the site.
At no time shall noise levels exceed a community noise equivalent (CNEL) of sixty (60) decibels (dBA) for any existing residence or other noise-sensitive land use. An existing residence shall be considered the property line of any residentially zoned area or, in the case of agricultural land, any occupied offsite residential structures. Achieving the noise standards may involve setbacks, the use of quieter equipment adjacent to residences, the construction of landscaped berms between mining activities and residences, or other appropriate measures.
(§ 1, Ord. 1190, eff. September 5, 1996; as amended by Ord. 1518, eff. February 13, 2020)
If mining occurs within fifteen hundred (1500) feet of residences, equipment used during nighttime activities shall be equipped with non- sonic warning devices (e.g., infrared) consistent with the California Office of Safety Hazard Administration (Cal OSHA) regulations, This may include fencing of the area to avoid pedestrian traffic, adequate lighting of the area, and placing an observer in clear view of the equipment operator to direct backing operations. If appropriate, prior to commencement of operations without sonic warning devices, operators shall file a variance request with the California OSHA Standards Board showing that the proposed operation would provide equivalent safety to adopted safety procedures, including sonic devices. This regulation applies to all sonic safety devices in use at the mining site, including sonic warnings on conveyors. (§ 1, Ord. 1190, eff. September 5, 1996; as amended by Ord. 1518, eff. February 13, 2020)