Sec. 10-5.517.   Mercury bioaccumulation in fish.
   As part of each approved long-term mining plan involving wet pit mining to be reclaimed to a permanent pond, lake, or water feature, the operator shall maintain, monitor, and report to the Director according to the standards given in this section. Requirements and restrictions are distinguished by phase of operation as described below.
   (a)   Mercury Protocols. The Director shall issue and update as needed “Lower Cache Creek Off-Channel Pits Mercury Monitoring Protocols” (Protocols), which shall provide detailed requirements for mercury monitoring activities. The Protocols shall include procedures for monitoring conditions in each pit lake, and for monitoring ambient mercury level in the lower Cache Creek channel within the CCAP planning area, as described below. The Protocols shall be developed and implemented by a qualified aquatic scientist or equivalent professional acceptable to the Director. The protocols shall identify minimum laboratory analytical reporting limits, which may not exceed the applicable response threshold identified in subsection (e) below. Data produced from implementing the Protocols shall meet or exceed applicable standards in the industry.
   (b)   Ambient Mercury Level. The determination of the ambient or “baseline” fish mercury level shall be undertaken by the County every ten (10) years in years ending in 0. This analysis shall be undertaken by the County for use as a baseline of comparison for fish mercury testing conducted in individual wet mining pits. The work to establish this baseline every ten (10) years shall be conducted by a qualified aquatic systems scientist acceptable to the Director and provided in the form of a report to the Director. It shall be paid for by the mining permit operators on a fairshare basis. The results of monitoring and evaluation of available data shall be provided in the report to substantiate the conclusions regarding ambient concentrations of mercury in fish within the lower Cache Creek channel within the CCAP planning area.
   (c)   Pit Monitoring.
   (1)   Mining Phase (including during idle periods as defined in SMARA). The operator shall monitor fish and water column profiles in each pit lake once every year during the period generally between September and November for the first five (5) years after a pit lake is created. Fish monitoring should include sport fish where possible, together with other representative species that have comparison samples from the creek and/or other monitored ponds. Sport fish are defined as predatory, trophic level four fish such as bass, which are likely to be primary angling targets and have the highest relative mercury levels. The requirements of this subsection apply to any pit lake that is permanently wet and navigable by a monitoring vessel. If, in the initial five (5) years after the pit lake is created, the applicable response threshold identified in subsection (e) is exceeded in any three (3) of five (5) monitoring years, the operator shall, solely at their own expense, undertake expanded analysis pursuant to subsection (f) and preparation of a lake management plan pursuant to subsection (g).
   (2)   Reclamation Phase. No monitoring is required after mining has concluded, during the period that an approved reclamation plan is being implemented, provided reclamation is completed within the time specified by SMARA or the project approval, whichever is sooner.
   (3)   Post-Reclamation Phase. After reclamation is completed, the operator shall monitor fish and water column profiles in each pit lake at least once every two (2) years during the period of September-November for ten (10) years following reclamation. Monitoring shall commence in the first calendar year following completion of reclamation activities. If fish monitoring results from the post-reclamation period exceed the applicable response threshold described in subsection (e) or, for ponds that have implemented mitigation management, results do not exhibit a general decline in mercury levels, the operator shall, solely at their own expense, undertake expanded analysis pursuant to subsection (f) and preparation of a lake management plan pursuant to subsection (g).
   (4)   Other Monitoring Obligation. If monitoring conducted during both the mining and post- reclamation phase did not identify any exceedances of the ambient mercury level for a particular pit lake, and at the sole discretion of the Director no other relevant factors substantially support that continued monitoring is merited, the operator shall have no further obligations.
   (d)   Reporting.
   (1)   Pit Monitoring Results. Reporting and evaluating of subsection (c) pit monitoring results shall be conducted by a qualified aquatic scientist or equivalent professional acceptable to the Director. Monitoring activities and results shall be summarized in a single report (addressing all wet pit lakes) and submitted to the Director within six (6) months following each annual monitoring event. The report shall include, at a minimum: (1) results from subsection (b) (pit monitoring), in relation to subsection (a) (ambient mercury levels).
   (2)   Expanded Analysis Results. Reporting and evaluation of subsection (f) expanded analysis shall be conducted by a qualified aquatic scientist or equivalent professional acceptable to the Director. Results shall be summarized in a single report (addressing all affected wet pit lakes) and submitted to the Director within six (6) months following each annual monitoring event. The report shall include, at a minimum, the results of the expanded analysis undertaken pursuant subsection (f).
   (3)   Data Sharing. For pit lakes open to the public, the Director may submit the data on mercury concentrations in pit lake fish to the state Office of Environmental Health Hazard Assessment (or its successor) for developing site-specific fish consumption advisories.
   (e)   Response Thresholds.
   (1)   Fish Consumption Advisory. If at any time during any phase of monitoring the pit lake’s average sport fish tissue mercury concentration exceeds the Sport Fish Water Quality Objective, as it may be modified by the state over time (as of 2019, the level was 0.2 mg/kg), the operator shall post fish consumption advisory signs at access points around the lake and around the lake perimeter. Catch-and-release fishing may still be allowed. Unless site-specific guidance has been developed by the state’s Office of Health Hazard Assessment or the County, statewide fish consumption guidance shall be provided.
   (2)   Mining Phase Results. If, during the mining phase of monitoring, the pit lake’s average fish tissue mercury concentration exceeds the ambient mercury level for any three (3) of five (5) monitoring years, annual monitoring shall continue for an additional five (5) years, and the operator shall undertake expanded analysis pursuant to subsection (f) and preparation of a lake management plan pursuant to subsection (g).
   (3)   Post-Reclamation Phase Results. If during the first ten (10) years of the post-reclamation phase of monitoring, the pit lake’s average fish tissue mercury concentration exceeds the ambient mercury level for any three (3) of five (5) monitoring years, biennial monitoring shall continue for an additional ten (10) years, and the operator shall undertake expanded analysis pursuant to subsection (f) and preparation of a lake management plan pursuant to subsection(g).
   (f)   Expanded Analysis.
   (1)   General. If during the mining or post-reclamation phase, any pit lake’s average fish tissue mercury concentration exceeds the ambient mercury level for any three (3) years, the operator shall undertake expanded analyses. The analysis shall include expanded lake water column profiling (a minimum of five (5) profiles per affected wet pit lake plus one or more nonaffected lakes for control purposes) conducted during the warm season (generally May through October) in an appropriate deep profiling location for each pit lake. The following water quality parameters shall be collected at regular depth intervals, from surface to bottom of each lake, following protocols identified in subsection (a): temperature, dissolved oxygen, conductivity, pH and oxidation-reduction potential (ORP), turbidity or total suspended solids, dissolved organic matter, and algal density by Chlorophyll or Phycocyanin. The initial analysis shall also include one-time collections of fine grained (clay/silt) bottom sediments from a minimum of six (6) well distributed locations for each affected lake, and from one or more nonaffected lakes for control purposes, to be analyzed for mercury and organic content.
   (2)   Scope of Analysis. The purpose of the expanded analyses is to identify and assess potential factors linked to elevated methylmercury production and/or bioaccumulation in each pit lake. The scope of the expanded analyses shall include monitoring and analysis appropriate to fulfill this purpose, invoking best practices in the industry. In addition to the analyses described in subsection (f)(1) above, the analysis should also consider such factors as: electrical conductivity, bathymetry (maximum and average depths, depth-to-surface area ratios, etc.), and trophic status indicators (concentrations, Secchi depth, chlorophyll a, fish assemblages, etc.). Additional types of testing may be indicated and appropriate if initial results are inconclusive.
   (3)   Use of Results. The results of the expanded analyses undertaken pursuant to this subsection shall be used to inform the preparation of a lake management plan described below under subsection (g).
   (g)   Lake Management Activities.
   (1)   General. If monitoring conducted during the mining or post-reclamation phases triggers the requirement to undertake expanded analysis and prepare and implement a lake management plan, the operator shall implement lake management activities designed by a qualified aquatic scientist or equivalent professional acceptable to the Director, informed by the results of subsection (f). Options for addressing elevated mercury levels may include (A) and/or (B) below at the Director’s sole discretion and at the operator’s sole expense.
   (A)   Lake Management Plan. Prepare a lake management plan that provides a feasible, adaptive management approach to reducing fish tissue mercury concentrations to at or below the ambient mercury level. Potential mercury control methods could include, for example: addition of oxygen to or physical mixing of anoxic bottom waters; alteration of water chemistry (modify pH or organic carbon concentration); and/or removal or replacement of affected fish populations. The lake management plan may be subject to external peer review at the discretion of the Director. Lake management activities shall be appropriate to the phase of the operation (e.g., during mining or post-reclamation). The Lake Management Plan shall include a recommendation for continued monitoring and reporting. All costs associated with preparation and implementation of the lake management plan shall be solely those of the operator. Upon acceptance by the Director, the operator shall immediately implement the plan. The lake management plan shall generally be implemented within three (3) years of reported results from the expanded analyses resulting from subsection (f). If lake management does not achieve acceptable results and/or demonstrate declining mercury levels after a maximum of three (3) years of implementation, at the sole discretion of the Director, the operator may prepare an alternate management plan with reasonable likelihood of mitigating the conditions.
   (B)   Revised Reclamation Plan. As an alternative to (A), or if (A) does not achieve acceptable results and/or demonstrate declining mercury levels after a maximum of three (3) years of implementation, at the sole discretion of the Director, the operator shall prepare and submit revisions to the reclamation plan (including appropriate applications and information for permit amendment) to fill the pit lake with suitable fill material to a level no less than five (5) feet above the average seasonal high groundwater level, and modify the end use to agriculture, habitat, or open space at the discretion of the Director, subject to Article 6 of the Mining Ordinance and/or Article 8 of the Reclamation Ordinance as may be applicable.
   (2)   Implementation Obligations.
   (A)   If a lake management plan is triggered during the mining or post- reclamation phase and the subsequent lake management activities do not achieve acceptable results and/or demonstrate declining mercury levels, the operator may propose different or additional measures for consideration by the Director and implementation by the operator, or
the Director may direct the operator to proceed to modify the reclamation plan as described in subsection (g)(1)(B).
   (B)   Notwithstanding the results of monitoring and/or lake management activities during the mining phase, the operator shall, during the post-reclamation phase, conduct the required ten (10) years of biennial monitoring.
   (C)   If monitoring conducted during the post-reclamation phase identifies three (3) monitoring years of mercury concentrations exceeding the ambient mercury level, the operator shall implement expanded analyses as in subsection (f), to help prepare and implement a lake management plan and associated monitoring.
   (D)   If subsequent monitoring after implementation of lake management activities, during the post-reclamation phase, demonstrates levels of fish tissue mercury at or below the ambient mercury level for any three (3) monitoring years (i.e., the management plan is effective), the operator shall be obligated to continue implementation of the plan and continue monitoring, or provide adequate funding for the County to do both, in perpetuity. (§ 1, Ord. 1191, eff. September 5, 1996; as amended by Ord. 1518, eff. February 13, 2020)