Skip to code content (skip section selection)
Compare to:
Yolo County Overview
Yolo County, CA Code of Ordinances
YOLO COUNTY, CA CODE OF ORDINANCES
Title 1 GENERAL PROVISIONS
Title 2 ADMINISTRATION
Title 3 FINANCE
Title 4 PUBLIC SAFETY
Title 5 PUBLIC WELFARE, MORALS, AND CONDUCT
Title 6 SANITATION AND HEALTH
Title 7 BUILDING REGULATIONS
Title 8 LAND DEVELOPMENT AND ZONING
Title 9 PARKS AND RECREATION
Title 10 ENVIRONMENT
Chapter 1 ENVIRONMENTAL IMPACT ASSESSMENTS*
Chapter 2 ELM TREES
Chapter 3 CACHE CREEK AREA PLAN IN-CHANNEL ORDINANCE*
Chapter 4 OFF-CHANNEL SURFACE MINING
Article 1. Title, Authority and Purpose
Article 2. Definitions
Article 3. Scope and Exemptions
Article 4. Off-Channel Mining Standards
Article 5. Surface Mining Permit Approval Process
Article 6. Amendments and Modifications to Approved Surface Mining Permits
Article 7. Annual Reports
Article 8. Fees
Article 9. Confidentiality of Records
Article 10. Appeals
Article 11. Inspections: Notices of Violations
Chapter 5 SURFACE MINING RECLAMATION*
Chapter 6 AGRICULTURE
Chapter 7 GROUNDWATER
CHAPTER 8 AGRICULTURAL SURFACE MINING AND RECLAMATION ORDINANCE
CHAPTER 9 STORMWATER MANAGEMENT AND DISCHARGE CONTROL
Chapter 10 HABITAT MITIGATION ORDINANCE
Chapter 11 GRAVEL MINING FEE ORDINANCE
Chapter 12 OFF-HIGHWAY VEHICLE USE AND OPERATION
Chapter 13 YOLO HCP/NCCP
Chapter 14 INDUSTRIAL HEMP CULTIVATION, MANUFACTURING, PROCESSING, AND STORAGE
Title 11 CABLE COMMUNICATIONS
Title 12 BUSINESS LICENSES
Parallel Reference Table
Loading...
Sec. 10-4.435.   Transfer of allocation.
   If a property is sold or transferred, the allocation attributed to the property transfers as well. If the transferred tonnage is still processed at the original plant site pursuant to the original permit approval, no additional environmental assessment or permits are required. If that transferred tonnage is processed elsewhere, additional analysis and approval shall be required. The new operator shall submit a signed statement of responsibility for reclamation of the site and post financial assurances with the Agency prior to commencement.
(§ 1, Ord. 1190, eff. September 5, 1996; as amended by Ord. 1518, eff. February 13, 2020)
Sec. 10-4.436.   Vegetation protection.
   Existing vegetation and habitat to be retained shall be enclosed by temporary fencing to restrict access, protect against damage and/or provide buffers to reduce the impact of dust. Temporary fencing shall be a minimum of four (4') feet high. The disturbance of riparian forest or oak woodland vegetation, including identified off-channel vegetation, should be avoided if possible. Replacement habitat and plantings shall be established where complete avoidance is not possible, according to a habitat restoration plan prepared by a qualified biologist, consistent with the goals of this plan.
(§ 1, Ord. 1190, eff. September 5, 1996; as amended by Ord. 1518, eff. February 13, 2020)
Sec. 10-4.437.   Wastewater discharge.
   No wastewater shall be directly discharged to Cache Creek. Sediment fines generated by aggregate processing shall either be used for agricultural soil enhancement, habitat restoration sites, or shall be placed in settling ponds, designed and operated in accordance with all applicable regulations, and used for backfill materials in off-channel excavations. Agricultural tailwater shall be diverted to catchment basins prior to its release to the creek.
(§ 1, Ord. 1190, eff. September 5, 1996; as amended by Ord. 1518, eff. February 13, 2020)
Sec. 10-4.438.   Watercraft.
   Only motorized dredges and draglines shall be allowed on the wet pit lakes. All other fuel-powered (gasoline or diesel) watercraft shall not be used on the wet pit lakes. Fuel-powered watercraft may be allowed for mercury sampling or bathometric measurements, as necessary, to fulfill requirements of this chapter. Electric-powered or nonmotorized boats shall be permissible.
(§ 1, Ord. 1190, eff. September 5, 1996; as amended by Ord. 1518, eff. February 13, 2020)
Sec. 10-4.439.   Wetlands.
   Existing jurisdictional wetlands shall be retained to the extent possible. Impacts to existing wetlands shall be mitigated where complete avoidance is not possible according to a habitat restoration plan prepared by a qualified wetland specialist and approved by any required jurisdictional agencies, ensuring no net loss of wetland acreage or habitat value.
(§ 1, Ord. 1190, eff. September 5, 1996; as amended by Ord. 1518, eff. February 13, 2020)
Sec. 10-4.440.   Wildlife habitat.
   Avoid disturbance to important wildlife habitat features such as bird nesting trees, colonial breeding locations, elderberry host plants for Valley Elderberry Longhorn Beetle, and mature riparian forest and oak woodland habitat. This shall include sensitive siting of haul roads, trails, and recreational facilities away from these features. Suitable habitat for special-status species shall be protected and enhanced, or replaced as a part of mitigation plans prepared by a qualified biologist where necessary, and through compliance with the Yolo HCP/NCCP for special-status species covered by that Plan. Mining and reclamation activities shall be performed in accordance with the State Fish and Game Code, Migratory Bird Treaty Act, and other applicable regulations to protect bird nests when in active use.
   Native-planted hedgerows and/or other vegetated buffers shall be included between restored habitat areas and adjoining farmland, in order to minimize the potential for riparian areas to serve as harbors for predators and insect pests. These buffers will also reduce the noise, dust, and spraying generated by agricultural operations, in addition to providing valuable pollinator resources that in turn could enhance agricultural production.
(§ 1, Ord. 1190, eff. September 5, 1996; as amended by Ord. 1518, eff. February 13, 2020)
Sec. 10-4.441.   Exceptions.
   Where an operator demonstrates to the lead agency that an exception to the standards specified in this article is necessary, the Commission may approve an alternative standard for inclusion in the approved surface mining permit. Exceptions shall only be approved where the strict application of the off-channel mining standards would deprive the operator of privileges enjoyed by other mining operators in the vicinity, due to special circumstances associated with the subject site, including size, shape, topography, location, or surroundings. Although the Commission may set alternative standards, in no case may the Commission set any standard which does not meet or exceed the policy objectives set forth in the OCMP.
(§ 1, Ord. 1190, eff. September 5, 1996; as amended by Ord. 1518, eff. February 13, 2020)