Every surface mining operator shall submit an annual report of surface mining operations no later than November 1 of each year, describing the activities of the previous twelve (12) months. Annual reports shall no longer be required, once final reclamation has been completed and financial assurances have been released. Operators shall submit one hard copy and one electronic copy to the County. Such reports shall contain the following information:
(a) A site plan submitted in the form prescribed by the Director, including all property proposed to be included in the reclamation plan, drawn to a scale of one inch equals one-hundred feet (1" = 100'), or other scale acceptable to the Director for larger holdings, and showing the following information:
(1) Property boundaries and the boundaries of permitted mining areas, including the depiction of separate mining phases;
(2) The existing contours;
(3) Contours which show the areas and depth of mining which have occurred since the previous annual report;
(4) Identification of any significant changes in the topography, such as bank failures, levee breaches, extensive erosion, etc. which have occurred since the previous annual report;
(5) Identification of erosion control structures, levees, berms, stockpiles, haul roads, settling ponds, habitat avoidance areas, and processing facilities;
(6) The extent of areas reclaimed since the previous annual report;
(7) The extent of any borrow areas, where topsoil and overburden are excavated for use in the reclamation of mined lands; and
(8) Updated graphic depictions of the control cross-sections approved in the surface mining permit application.
The site plan shall include a certificate from a licensed land surveyor or registered civil engineer certifying that the site plan and cross-sections were prepared by or under the direct supervision of the surveyor or engineer;
(b) A statement of the total amount of minerals produced since the date of the initial permit approval and since the date of the preceding annual report. Such information shall be consistent with the data submitted to the Department, as required in Section 2207 et seq. of Chapter 2 of Division 2 of the Public Resources Code of California. Production information shall be considered confidential under Section 10-4.901 of this chapter. Such reports shall be submitted as a declaration under penalty of perjury;
(c) A statement of the total amount of concrete and asphalt materials recycled since the date of the preceding annual report, and a statement of the total amount of aggregate removed from Cache Creek as a result of channel maintenance and reshaping activities in accordance with the CCRMP;
(d) A report prepared by a qualified hydrologist describing the data obtained from the on-site groundwater monitoring program, prepared in accordance with Section 10-4.417. The report shall recommend appropriate remedial measures if contamination in exceedance of established thresholds is indicated;
(e) A report describing the previous year’s crop yields on any land in the process of being reclaimed to agriculture in accordance with the approved reclamation plan. The report shall include a soil analysis and appropriate remedial measures prepared by a qualified agronomist if crop yields do not meet the production standards set forth in the approved reclamation plan;
(f) A report prepared by a qualified biologist describing the density, coverage, and species-richness of any on-site areas that are being revegetated with plants other than agricultural crops in accordance with the approved reclamation plan. The report shall compare the observed data with the performance standards set forth in the approved reclamation plan and shall recommend remedial measures if the previous year’s revegetation efforts have not been successful;
(g) A report prepared by a Registered Geologist, a Licensed Geotechnical Engineer, or a Registered Civil Engineer describing the remedial measures necessary to remediate any slope failures, levee breaches, or other topographical problems referred to in the site plan above;
(h) A report describing the extent of mining carried out over the previous year and the conformance of the operation with the approved reclamation timetable and/or phasing plan. Said report shall also describe the proposed extent of operations to be carried out over the following year;
(i) A report describing the compliance of the surface mining operation with the approved conditions of approval;
(j) A table, matrix, or report identifying all adopted CEQA mitigation measures by number and text, and describing compliance with these measures, pursuant to the Mitigation Monitoring Program adopted for the project; and
(k) A statement describing the status of any permits or approval issued by other agencies of jurisdiction; and
(l) A report describing the compliance with the applicable terms of the approved Development Agreement.
(§ 1, Ord. 1190, eff. September 5, 1996; as amended by Ord. 1518, eff. February 13, 2020)
Annual reports shall be submitted to the Director for review and determination as to completeness. If the annual report is determined to be incomplete, the Director shall notify the operator in writing within thirty (30) days of receipt of the annual report. The written notice shall specifically describe the information necessary to complete the annual report. The annual report shall not be processed until the Director has determined it to be complete and the appropriate fees have been paid, as required under Article 8 of this chapter.
Once the annual report has been determined to be complete and the appropriate fees have been paid, the annual report shall be filed by the Director and made available for public review.
(§ 1, Ord. 1190, eff. September 5, 1996; as amended by Ord. 1518, eff. February 13, 2020)
Every year, the Planning Commission shall hold a public hearing, in accordance with Article 5 of this chapter, regarding the compliance status of each surface mining operation permitted pursuant to this title. After considering the evidence in the public hearing, the Commission shall find that the operation either complies or does not comply with the Act, this chapter, and the conditions of approval for the surface mining permit. If the Commission finds that the operation is not in compliance, then the Director shall commence Notice of Violation proceedings, pursuant to Article 11 of this Chapter.
Within ten (10) days after the decision of the Commission, the Director shall mail a copy of the decision to the operator. Copies of the decision shall also be mailed to any other person with an interest in the application, who has deposited a self-addressed, stamped envelope with the Agency for the purpose of receiving a copy of the decision. The decision of the commission may be appealed in accordance with Article 10 of this chapter.
(§ 1, Ord. 1190, eff. September 5, 1996; as amended by Ord. 1518, eff. February 13, 2020)
Article 8.
Fees
Fees
Each application for a surface mining permit or any amendments and modifications thereto shall be accompanied by the appropriate fee as determined in the Master Fee Resolution adopted by the Board.
(§ 1, Ord. 1190, eff. September 5, 1996; as amended by Ord. 1518, eff. February 13, 2020)
Each operator individually shall be responsible for the payment of fees to cover the costs incurred by the County in annually inspecting the facilities of that operation, pursuant to Section 10-4.1103 of this chapter, as determined by the Master Fee Resolution adopted by the Board and any and all costs associated with the administration of Article 11. Said fee shall be due within thirty (30) days of written notification by the Director. This fee shall also cover the costs of the annual compliance review required under Article 7 of this chapter.
In addition, each operator shall participate in a funding mechanism to reimburse the County for any costs associated with administering the Act and this chapter, not otherwise covered by the fees listed above. Administrative fees shall be placed in a separate account of the General Fund that is used solely for the purpose of administering the Act and this chapter.
(§ 1, Ord. 1190, eff. September 5. 1996; as amended by Ord. 1518, eff. February 13, 2020)
Each operator shall pay an annual surcharge of two (2¢) cents per ton (sold)to be placed into a maintenance and remediation fund to be used solely for purposes directly related to the protection and restoration of the lower Cache Creek watershed. This surcharge shall be imposed in addition to the surcharge required for the CCRMP and CCIP. The maintenance and remediation fund shall be held by the County in a separate trust account, segregated from any other revenues.
No expenditures may be drawn from this fund for thirty (30) years. After 2026, interest derived from the maintenance and remediation fund shall be made available for the following activities: remediation of problems related to mercury bioaccumulation in wildlife; remediation of hazardous materials contamination; environmental monitoring; and/or ongoing site maintenance (e.g., fencing, berms, drainage, levees, or permanent lakes). After 2046, the County shall determine whether the fund is still merited. If it is determined that monitoring, maintenance, and/or remediation is no longer required, then the entire fund shall be made available for implementation of the goals of the OCMP and/or CCRMP, such as the restoration or creation of habitat, the creation of open space and passive recreation opportunities, and restoration and stabilization of Cache Creek.
Any disbursement of money from the maintenance and remediation fund shall require approval by the Board of Supervisors. Use of this fund for any purposes other than those specified above is prohibited.
(§ 1, Ord. 1190, eff. September 5, 1996; as amended by Ord. 1518, eff. February 13, 2020)