65.01 Purpose | 65.19 Soil Protection |
65.02 Applicability | 65.20 Holding Tanks |
65.03 Adoption of State Code | 65.21 Subdivision Planning for Wastewater Treatment |
65.04 Designated Agency | 65.22 Subdivision Lot Site Evaluations |
65.05 Additional Rules | 65.23 Engineer's Design |
65.06 Definitions | 65.24 Septic Construction Permit to Be Issued By EH |
65.07 Abbreviations | 65.25 Denial of Permit |
65.08 Setbacks | 65.26 Voiding of Permit |
65.09 Sharing Septic Systems Prohibited | 65.27 Permit Expiration |
65.10 When Septic Construction Permit Needed | 65.28 Certified Installer |
65.11 Documents Needed for Septic Construction Permit | 65.29 Request for Final Inspection |
65.12 When Septic Alteration Permit Needed | 65.30 Final Inspection |
65.13 Documents Needed for Septic Alteration Permit | 65.31 Certificate of Completion |
65.14 Application for Septic Construction or Septic Alteration Permits | 65.32 Inspection No Relief from Responsibility |
65.15 New Wastewater Generation That Is to Be Directed to An Existing Septic System | 65.33 Minimum Level of Septic System Maintenance Required |
65.16 Fees | 65.34 Systems That Require Maintenance Contracts |
65.17 Site Evaluation | 65.35 Discharging Systems |
65.18 Site Evaluation Report Content | 65.36 Variances |