Skip to code content (skip section selection)
Compare to:
CHAPTER 65
PRIVATE SEWAGE DISPOSAL SYSTEMS
65.01 Purpose
65.19 Soil Protection
65.02 Applicability
65.20 Holding Tanks
65.03 Adoption of State Code
65.21 Subdivision Planning for Wastewater Treatment
65.04 Designated Agency
65.22 Subdivision Lot Site Evaluations
65.05 Additional Rules
65.23 Engineer's Design
65.06 Definitions
65.24 Septic Construction Permit to Be Issued By EH
65.07 Abbreviations
65.25 Denial of Permit
65.08 Setbacks
65.26 Voiding of Permit
65.09 Sharing Septic Systems Prohibited
65.27 Permit Expiration
65.10 When Septic Construction Permit Needed
65.28 Certified Installer
65.11 Documents Needed for Septic Construction Permit
65.29 Request for Final Inspection
65.12 When Septic Alteration Permit Needed
65.30 Final Inspection
65.13 Documents Needed for Septic Alteration Permit
65.31 Certificate of Completion
65.14 Application for Septic Construction or Septic Alteration Permits
65.32 Inspection No Relief from Responsibility
65.15 New Wastewater Generation That Is to Be Directed to An Existing Septic System
65.33 Minimum Level of Septic System Maintenance Required
65.16 Fees
65.34 Systems That Require Maintenance Contracts
65.17 Site Evaluation
65.35 Discharging Systems
65.18 Site Evaluation Report Content
65.36 Variances