1. New construction with wastewater generation.
2. An existing system not large enough to treat a proposed increase for wastewater loading and/or wastewater strength. Examples include, but are not limited to:
A. A new home business such as, but not limited to a daycare, restaurant, beauty salon.
B. An increase in the number of bedrooms that the existing septic system is undersized to treat.
3. Replacement or enlargement of the secondary system.