Skip to code content (skip section selection)
Compare to:
65.10   WHEN SEPTIC CONSTRUCTION PERMIT NEEDED.
   1.   New construction with wastewater generation.
   2.   An existing system not large enough to treat a proposed increase for wastewater loading and/or wastewater strength. Examples include, but are not limited to:
      A.   A new home business such as, but not limited to a daycare, restaurant, beauty salon.
      B.   An increase in the number of bedrooms that the existing septic system is undersized to treat.
   3.   Replacement or enlargement of the secondary system.