Skip to code content (skip section selection)
Compare to:
65.30   FINAL INSPECTION.
All newly constructed or altered private sewage disposal systems shall be inspected  by EH. The  installer  shall  leave  enough  of  the  system  exposed so that a  thorough  inspection  of  the  system  may  be  conducted. A  certified  installer  shall be available to discuss details of the installation. EH will inform the installer of any concerns with the system installation that need to be remedied. The purpose of the final inspection is to collect field data in order to document the system's description and location, to determine if the permit intent was accomplished, and to assess the workmanship. A final as-built drawing shall be made as part of the final inspection.