CHAPTER 51: GENERAL SEWER USE AND
WASTEWATER PRETREATMENT
Section
General Provisions
   51.001   Purpose and policy
   51.002   Administration
   51.003   Abbreviations
   51.004   Definitions
   51.005   General regulations
   51.006   Connection requirements; connection charges
   51.007   Connection permits
   51.008   General requirements for the construction of sewers and laterals
   51.009   Installation and specification
   51.010   Maintaining and repairing sewers
   51.011   Extensions outside the town
   51.012   Right to prohibit new connections
   51.013   Private wells
Wastewater Admissibility and General Requirements
   51.025   Prohibited discharge standards
   51.026   Abnormal waste surcharge
   51.027   National categorical pretreatment standards
   51.028   Local limits
   51.029   Town’s right of revision and modifications
   51.030   Dilution
Pretreatment of Wastewater
   51.045   Pretreatment facilities
   51.046   Additional pretreatment measures
   51.047   Accidental discharge/slug control plans
   51.048   Hauled wastewater
Wastewater Discharge Permit Application
   51.060   Wastewater analysis
   51.061   Wastewater discharge permit requirement
   51.062   Wastewater discharge permitting: existing connections
   51.063   Wastewater discharge permitting: new connections
   51.064   Wastewater discharge permit application contents
   51.065   Fees, rates, and charges
Regulation of Waste Received from Other Districts
   51.080   Inter-local agreements
   51.081   Information
   51.082   Inter-local agreement conditions
Reporting Requirements
   51.095   Notice of violation/repeat sampling and reporting
   51.096   Notification of the discharge of hazardous waste
   51.097   Analytical requirements
   51.098   Sample collection
   51.099   Recordkeeping
Compliance Monitoring
   51.110   Monitoring
   51.111   Industrial survey
   51.112   Right of entry: inspection and sampling
   51.113   Search warrants
Confidential Information
   51.115   Confidential information
Publication of Users in Significant Noncompliance
   51.120   Publication of users in significant noncompliance
Administrative Enforcement Remedies
   51.125   Notification of violation
   51.126   Agreed orders
   51.127   Show cause hearing
   51.128   Compliance orders
   51.129   Cease and desist orders
   51.130   Administrative fines
   51.131   Emergency suspensions
   51.132   Termination of discharge
Judicial Enforcement Remedies
   51.145   Injunctive relief
   51.146   Civil penalties
   51.147   Reserved
   51.148   Remedies nonexclusive
Supplemental Enforcement Action
   51.160   Performance bonds
   51.161   Liability insurance
   51.162   Water supply severance
   51.163   Public nuisances
   51.164   Contractor listing
Affirmative Defenses to Discharge Violations
   51.175   Upset
   51.176   Prohibited discharge standards
   51.177   Bypass
Fees, Rates, and Sewer Charges
   51.190   Permit fees
   51.191   Water usage; meter reading schedule
   51.192   Water obtained from other sources
   51.193   Single meter for multiple properties
   51.194   Multiple meters for single industrial user
   51.195   Portion of water not entering sewerage system
   51.196   Billing procedures
   51.197   Town subject to sewer charges
   51.198   Sewer charges
   51.199   Delinquent accounts
   51.200   Adjustments for fire protection
   51.201   Equitable adjustment; unusual circumstances
   51.202   Rates outside town
Review of Regulations by Town
   51.215   Wastewater review
Miscellaneous provisions
   51.230   Pretreatment charges and fees
   51.231   Operation of POTW
   51.232   Effective dates