709.09   FENCING.
   All tanks, pipes which are located above the common grade level of the site area, gauges, meters and all other structures left in place after the drilling operation is completed shall be surrounded by a six foot high chain link fence with a barbed wire top section which slopes outward at an angle greater than fifteen degrees.
(Ord. 11-1984. Passed 11-13-84.)