Loading...
A special inspector shall maintain records of special inspections on a building by building basis for at least six years or for such period as the commissioner shall determine and shall make such records available to the department upon request.
(Am. L.L. 2021/126, 11/7/2021, eff. 11/7/2022)
Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2021/126.
Construction or work for which a permit is required shall be subject to inspection in accordance with this code and such construction or work shall remain accessible and exposed for inspection purposes until the required inspection is completed. A satisfactory inspection by the department or the acceptance by the department of a satisfactory report of an inspection by an approved agency shall not be construed to be an approval by the department of a violation of the provisions of this code or of any other provision of law. It shall be the duty of the permit holder to cause the work to remain accessible and exposed for inspection purposes. The permit holder shall be liable for any expense entailed in the removal or replacement of any material required to allow inspection. The inspector shall supply a report of the results of each inspection.
An approved agency conducting inspections shall report defective work and discrepancies with the approved construction documents to the contractor and, when applicable, to the superintendent of construction, for correction. The approved agency shall report uncorrected discrepancies and defective work to the registered design professional of record and the owner in writing.
The inspections set forth in sections 28-116.2.1 through 28-116.2.4 are required or authorized by this code.
Before approving construction documents, the commissioner is authorized to examine or cause to be examined structures or premises for which an application has been filed. The department shall conduct preliminary inspections of no less than 20 percent of buildings containing six or more units where (i) an application for construction documents is submitted to the department and (ii) the applicant has indicated that the building that is the subject of such application is unoccupied, in order to verify the occupancy status of such sites.
(Am. L.L. 2019/115, 6/8/2019, eff. 1/1/2020)
Loading...