10-2-2: FEES:
   A.   Building Permits:
From
To
Maximum Fee
From
To
Maximum Fee
0
500
$ 25.00
501
600
27.00
601
700
30.00
701
800
33.00
801
900
36.00
901
1,000
40.00
1,001
1,100
45.00
1,101
1,200
48.00
1,201
1,300
50.00
1,301
1,400
53.00
1,401
1,500
57.00
1,501
1,600
60.00
1,601
1,700
63.00
1,701
1,800
68.00
1,801
1,900
72.00
1,901
2,000
75.00
2,001
3,000
90.00
3,001
4,000
105.00
4,001
5,000
120.00
5,001
6,000
135.00
6,001
7,000
150.00
7,001
8,000
165.00
8,001
9,000
180.00
9,001
10,000
195.00
10,001
11,000
210.00
11,001
12,000
215.00
12,001
13,000
230.00
13,001
14,000
245.00
14,001
15,000
260.00
15,001
16,000
275.00
16,001
17,000
290.00
17,001
18,000
305.00
18,001
19,000
320.00
19,001
20,000
335.00
20,001
21,000
350.00
21,001
22,000
365.00
22,001
23,000
380.00
23,001
24,000
395.00
24,001
25,000
410.00
25,001
26,000
420.00
26,001
27,000
430.00
27,001
28,000
440.00
28,001
29,000
450.00
29,001
30,000
460.00
30,001
31,000
470.00
31,001
32,000
480.00
32,001
33,000
490.00
33,001
34,000
500.00
34,001
35,000
510.00
35,001
36,000
520.00
36,001
37,000
530.00
37,001
38,000
540.00
38,001
39,000
550.00
39,001
40,000
560.00
40,001
41,000
570.00
41,001
42,000
580.00
42,001
43,000
590.00
43,001
44,000
600.00
44,001
45,000
610.00
45,001
46,000
620.00
46,001
47,000
630.00
47,001
48,000
640.00
48,001
49,000
650.00
49,001
50,000
660.00
50,001
51,000
670.00
51,001
52,000
677.00
52,001
53,000
684.00
53,001
54,000
691.00
54,001
55,000
698.00
55,001
56,000
705.00
56,001
57,000
712.00
57,001
58,000
719.00
58,001
59,000
726.00
59,001
60,000
733.00
60,001
61,000
740.00
61,001
62,000
747.00
62,001
63,000
754.00
63,001
64,000
761.00
64,001
65,000
768.00
65,001
66,000
775.00
66,001
67,000
782.00
67,001
68,000
789.00
68,001
69,000
796.00
69,001
70,000
803.00
70,001
71,000
810.00
71,001
72,000
817.00
72,001
73,000
824.00
73,001
74,000
831.00
74,001
75,000
838.00
75,001
76,000
845.00
76,001
77,000
852.00
77,001
78,000
859.00
78,001
79,000
863.00
79,001
80,000
870.00
80,001
81,000
877.00
81,001
82,000
884.00
82,001
83,000
891.00
83,001
84,000
898.00
84,001
85,000
905.00
85,001
86,000
912.00
86,001
87,000
919.00
87,001
88,000
926.00
88,001
89,000
933.00
89,001
90,000
940.00
90,001
91,000
947.00
91,001
92,000
954.00
92,001
93,000
961.00
93,001
94,000
968.00
94,001
95,000
975.00
95,001
96,000
982.00
96,001
97,000
989.00
97,001
98,000
996.00
98,001
99,000
1,003.00
99,001
100,000
1,010.00
100,001
500,000
$1,010.00 plus $6.00 per 1,000 valuation over 100,000
500,001
1,000,00 0
$3,410.00 plus $5.00 per 1,000 valuation over 500,000
1,000,000 +
 
$5,910.00 plus $3.00 per 1,000 valuation over 1,000,000
 
 
B.
Demolition Permits:
 
 
1.
Minimum charge and accessory buildings and garages:
$ 55.00
 
2.
One- and two-family dwellings:
55.00
 
3.
All other one-story buildings:
110.00
 
4.
For each additional story over 1 (not applicable to dwellings):
25.00
C.
Moving Permits:
 
 
1.
Garage or accessory building:
110.00
 
2.
Residential or commercial building:
110.00
D.
Filling Permit: Residential or commercial building:
25.00
E.
Concrete Flatwork Permits:
 
 
1.
Curb cut fee:
25.00
 
2.
Approach fee:
25.00
 
3.
Sidewalk fee:
25.00
 
   F.   Excavation Permits: The fee for each and every excavation permit issued by the building inspector under authority of this chapter shall be fifty-five dollars ($55.00) for the excavation in any street or alley. No refund shall be made of any excavation permit fee.
   G.   Inspections:
 
Inspections outside of normal business hours (minimum charge 2 hours)
$50.00 per hour1
Reinspection fees assessed under provisions of section 304e and 702c
50.00 per hour1
Inspections for which no fee is specifically indicated (minimum charge 1/2 hour)
50.00 per hour1
Additional plan review required by changes, additions, or revisions to approved plans (minimum charge 1/2 hour)
50.00 per hour1
For use of outside consultants for plan checking and inspections, or both
Actual costs2
Project over $25,000.00 is 25% of the plan review fee
Notes:
1.   Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved.
2.   Actual costs include administrative and overhead costs.
 
   H.   Swimming Pools: The fee for each and every swimming pool permit issued by the building inspector under authority of this chapter shall be twenty-five dollars ($25.00).
   I.   Storage Tanks: The fee for the permit authorizing the installation or removal of storage tanks issued by the building inspector under authority of this chapter shall be fifty five dollars ($55.00). (Ord. 1570, 9-17-2012; amd. Ord. 1776, 11-6-2023)