Section
Electric System Administration
50.01 Power Board
50.02 Powers and duties
50.03 Responsibility for receipts and deposits
Application for Service and Deposit
50.15 Application for electrical service
50.16 Deposit required
50.17 Rejection of application
Discontinuance of Service
50.30 Notice required
50.31 Conditions for termination by town
50.32 Fee for reconnection
50.33 Tampering unlawful
50.34 Utility Appeals Board
Rates and Bills
50.45 Electric rates
50.46 Billing procedures
50.47 Returned checks
Meters
50.60 Installation of meters
50.61 Connection fees
50.62 Meter failure
50.63 Special meter readings
50.64 Meter tests
50.65 Access to meters
50.66 Line extension policy
50.67 Line extensions
Customer Generating Facilities
50.70 General provisions
50.71 Conditions of service for customers with solar generation facilities
50.72 Net metering rates, charges, and taxes
50.73 General statement of technical guidelines for interconnections with solar generation facilities
50.99 Penalty
Editor’s note:
This chapter was revised 4- -1987.