Skip to code content (skip section selection)
Compare to:
Will County Overview
Will County, IL Code of Ordinances
WILL COUNTY, ILLINOIS CODE OF ORDINANCES
ADOPTING ORDINANCE
TITLE I: GENERAL PROVISIONS
TITLE III: ADMINISTRATION
TITLE V: PUBLIC WORKS
TITLE VII: TRAFFIC CODE
TITLE IX: GENERAL REGULATIONS
TITLE XI: BUSINESS REGULATIONS
TITLE XIII: OFFENSES AGAINST COUNTY REGULATIONS
TITLE XV: LAND USAGE
CHAPTER 150: BUILDING CODE
CHAPTER 151: (RESERVED)
CHAPTER 152: (RESERVED)
CHAPTER 153: SWIMMING POOLS
CHAPTER 154: SUBDIVISION REGULATIONS
CHAPTER 155: ZONING CODE
CHAPTER 156: POLLUTION CONTROL FACILITIES
CHAPTER 157: ECONOMIC DEVELOPMENT
CHAPTER 158: LAND USE FEE SCHEDULE
CHAPTER 159: CONTRIBUTIONS TO LIBRARY DISTRICTS
CHAPTER 160: SCHOOL SITE CONTRIBUTION
CHAPTER 161: CAPITAL IMPROVEMENT PLAN
CHAPTER 162: STREET NAMING AND STREET SIGNS
CHAPTER 163: COUNTY LAND RESOURCE MANAGEMENT PLAN
CHAPTER 164: WATER RESOURCE ORDINANCES
CHAPTER 165: (RESERVED)
CHAPTER 166: HISTORIC PRESERVATION
TABLE OF SPECIAL ORDINANCES
PARALLEL REFERENCES
Loading...
IMPROVEMENT PLANS
§ 154.375 INTENT.
 
   The improvement plan stage of the major subdivision approval process is for the purpose of accurately showing how subdivision improvements (streets and drainage facilities, for example) will be constructed in order to conform to the layout and design objectives of the preliminary plat and the standards of this chapter.
(Ord. passed 7-8-1970; Res. 09-167, passed 6-18-2009)
§ 154.376 TIMING.
   (A)   Improvement plans may be submitted with the preliminary plat or the developer may choose to obtain preliminary plat approval before submitting detailed improvement construction plans, in which case improvement plans may be submitted before or concurrently with submittal of the final plat.
   (B)   When conditions warrant, the Chief Subdivision Engineer may require that preliminary engineering or improvement plans be submitted during the preliminary plat review process in order to determine the land’s suitability for the preliminary plat design. Any required off-site improvements and engineering studies must be provided upon request of the Chief Subdivision Engineer.
   (C)   If only a single portion or phase of the subdivision will be submitted for final plat approval and the phasing plan has been approved at the time of preliminary plat approval, improvement plans need be prepared for only that phase. However, the entire area of the proposed subdivision, as well as any additional area necessary to properly design facilities, must be the basis for design and must be so indicated.
(Ord. passed 7-8-1970; Res. 09-167, passed 6-18-2009)
§ 154.377 RESPONSIBILITY FOR PREPARATION.
   Improvement plans for streets, utilities and other public improvements required within the proposed subdivision must be prepared by a state registered professional engineer.
(Ord. passed 7-8-1970; Res. 09-167, passed 6-18-2009)
§ 154.378 APPLICATION FILING.
   A site development permit application and improvement plans must be submitted to the Chief Subdivision Engineer.
(Ord. passed 7-8-1970; Res. 09-167, passed 6-18-2009)
§ 154.379 REVIEW AND FINAL DECISION; CHIEF SUBDIVISION ENGINEER.
   (A)   The Chief Subdivision Engineer must review improvement plans to determine if the plans comply with all applicable regulations of this chapter and county standards and specifications.
   (B)   If the Chief Subdivision Engineer determines that the improvement plans do not comply with applicable regulations and standards, the Chief Subdivision Engineer is authorized to require that modifications be made to bring the improvement plans into compliance with regulations and standards.
   (C)   After conducting a complete review of the improvement plans, the Chief Subdivision Engineer must approve or deny the application for improvement plan approval.
(Ord. passed 7-8-1970; Res. 09-167, passed 6-18-2009)
§ 154.380 CONSTRUCTION SCHEDULE.
   Before approval of the improvement plans, the applicant must submit to the Chief Subdivision Engineer and to all approving agencies and to public utility companies that will service the subdivision a general schedule of the timing and sequence for construction of all required improvements.
(Ord. passed 7-8-1970; Res. 09-167, passed 6-18-2009)
§ 154.381 TIMING OF IMPROVEMENTS.
   Except upon the written approval of the Chief Subdivision Engineer, no grading, removal of trees or other vegetation, land filling, construction of improvements or other material change, except for the purpose of aiding in preparation of final engineering drawings or plans, may begin on the subject property until the applicant has:
   (A)   Received a site development permit from the Chief Subdivision Engineer; and
   (B)   Obtained necessary approvals and permits from other affected municipal, county, state or federal agencies.
(Ord. passed 7-8-1970; Res. 09-167, passed 6-18-2009)