(A) Improvement plans may be submitted with the preliminary plat or the developer may choose to obtain preliminary plat approval before submitting detailed improvement construction plans, in which case improvement plans may be submitted before or concurrently with submittal of the final plat.
(B) When conditions warrant, the Chief Subdivision Engineer may require that preliminary engineering or improvement plans be submitted during the preliminary plat review process in order to determine the land’s suitability for the preliminary plat design. Any required off-site improvements and engineering studies must be provided upon request of the Chief Subdivision Engineer.
(C) If only a single portion or phase of the subdivision will be submitted for final plat approval and the phasing plan has been approved at the time of preliminary plat approval, improvement plans need be prepared for only that phase. However, the entire area of the proposed subdivision, as well as any additional area necessary to properly design facilities, must be the basis for design and must be so indicated.
(Ord. passed 7-8-1970; Res. 09-167, passed 6-18-2009)