§ 35.01 FEE SCHEDULE.
   (A)   Fees from Title III: Administration.
Code Section
Ch. 34: General Town Policies
Fee
Code Section
Ch. 34: General Town Policies
Fee
Urban Development Areas
 
   Value of Proposed Improvements
 
      $0 to $25,000.99
$50
      $25,001 to $75,000.99
$150
      $75,001 to $500,000.99
$300
      $500,001 and over
$500
Vehicle Inspection Fee
$5
Copying all public documents not otherwise set forth herein:
   Black and white copies
   Color copies
$0.10 per page
$0.25 per page
Police Department fees
   Copying an accident report
$10
   Basic background investigation
$5
   Fingerprinting:
      Resident
      Non-resident
$15
$20
   CAD/incident summary
$10
   Annual golf cart registration:
      Daytime
      Night time
$25
$30
   VIN check
$5
   Vehicle impound release form
$20
   Photo CD copy, per disc
$10
   Production of video camera footage:
      Body camera footage
$150 per disc
      Patrol car camera footage
$150 per disc
      Station video footage
$150 per disc
      Security camera footage
$150 per disc
Town Clerk’s Office fees
   Walkerton Lincoln Fire Territory run report
$25
 
(2005 Code, §§ 22.02, 60.11) (Ord. 1983-17, passed 12-19-1983; Res. 2019-5, passed 8-5-2019)
   (B)   Fees from Title V: Public Works.
 
Code Section
Ch. 50: General Utilities
Fee
Refund of utility billing or deposits
No refund of less than $2
 
Ch. 51: Electricity
Fee
Ch. 51: Electricity
Fee
Monthly rates: residential service - Rate “R”
   Customer charge - per month*
$18.15
   Energy charge - per kWh
0.090787
   * Customer charge for temporary service shall be $25.00 per month
Monthly rates: commercial service - Rate “CS”
 
   Customer charge - per month
$26.05
   Energy charge - per kWh
0.10765
Monthly rates: large commercial service - Rate “C1”
 
   Customer charge - per month
$92.35
   Energy charge - per kWh
0.082302
Monthly rates: power service - Rate “P”
 
   Customer charge
      Secondary - per month
$249.61
   Customer charge
      Secondary - per kW - demand
$24.96
   Energy charge
      Secondary - per kWh
0.032883
Monthly rates: small municipal service - Rate “MS”
 
   Customer charge - per month
$26.05
   Energy charge - per kWh
0.081996
Monthly rates: large municipal service - Rate “M1”
 
   Customer charge - per month
$92.35
   Energy charge - per kWh
0.101659
Monthly rates: municipal street and security lighting - Rate “MSL”
 
   Size of lamp (LED)
      65-watt
$5.60
      95-watt
$5.59
      142-watt
$5.60
   Size of lamp (high pressure sodium)
      100-watt
$5.92
Monthly rates: off-peak service - Rate “OP”
 
   Demand payment
 
      First 200 kilowatts or less per month
$2,084.19
      Over 200 kilowatts per month
$10.95
   Energy payment
 
      Kilowatt-hours used per month
$0.024695
Monthly minimum payment
Not less than $2,084.19
 
(Ord. 2010-4, passed 12-20-2010; Ord. 2017-8, passed 12-18-2017; Ord. 2018-8, passed 12-18-2018; Ord. 2022-3, passed 7-11-2022)
 
Code Section
Ch. 52: Garbage and Rubbish
Fee
Monthly rate for residential customers
$13.00
 
(Ord. 2017-3, passed 8-7-2017)
 
Code Section
Ch. 53: Water
Fee
Code Section
Ch. 53: Water
Fee
Deposits
 
   Homeowners
$50 per meter
   Renters (copy of lease required)
$100 per meter
Service Connections
 
   3/4 inch meter
$600 or actual cost, including excavation, backfill and labor, whichever is greater
   1 inch
$600 or actual cost, including excavation, backfill and labor, whichever is greater
   Larger than 1 inch
Actual expense plus 20% for overhead
Connection capacity fees
   5/8 - 3/4" (ratio 1.0)
$747
   1" (ratio 2.5)
$1,868
   1 1/2" (ratio 5.7)
$4,258
   2" (ratio 10.0)
$7,470
   3" (ratio 23.0)
$17,181
   4" (ratio 40.0)
$29,880
Main extension policy; size increase of more than four inches in diameter
 
Increase in Pipe Diameter
Reimbursement per Foot of Pipe Installed
6
$0.50
8
$1
10
$1.25
12
$1.50
14
$1.75
16
$2
18
$2.50
20
$2.75
22
$3
24
$3.50
53.48(K)(1)
Where main extension is required
Actual cost, plus 20% overhead and non-construction costs
53.48(K(2)
Connection made without obtaining a permit
Charge of $150 a day for each day the connection was unlawfully installed and be required to remove the connection until a permit is obtained
 
(2005 Code, §§ 104.106, 104.108, 104.117, 104.120) (Ord. 2002-17, passed 12-16-2002; Ord. 2003-7, passed 8-4-2003)
Code Section
Ch. 54: Sewers
Fee
Code Section
Ch. 54: Sewers
Fee
Requirements; private sewage disposal system; permit and inspection fee
$25
54.039(B)(2)
Permits; building sewer permit; permit and inspection fee
   Industrial building sewer permit
$125
   Residential or commercial building sewer permit
$25
General connection fee; hook-on fee
$750
Multiple dwelling connection fee
$750 plus a $50 per unit fee beginning with the second unit
Commercial haulers
 
Industrial and/or commercial
$500/1,000 gallons
Septic tank (residential)
$40/1,000 gallons
Control of admissible industrial wastes
 
Fees
 
   Industries connected to sewage works after the effective date of §§ 54.095 through 54.102 and all reapplication permits
$500
   Initial major contributor permit industries connected to sewage works prior to the effective date of this chapter
$100
Surveillance survey charge
 
   Minimum charge
$100
   Maximum charge
$700
54.099(M)(2 )
Dump fees
 
   Industrial and/or commercial
$500/1,000 gallons
   Septic tank (residential)
$3/1,000 gallons
 
(2005 Code, §§ 100.53, 100.54, 102.04, 102.05, 102.21, 102.22)
 
Code Section
Ch. 55: Net Energy Metering
Fee
Net metering tariff
 
   Application for interconnection service
$100
   Customer charge
$50 per meter per month
 
(Ord. 2015-19, passed 11-16-2015)
 
Code Section
Ch. 93: Alarm Systems
Fee
Fees; who assessed
 
   Three false alarms in any calendar year
No fee
   Fourth false alarm in any calendar year
$75
   Fifth false alarm in any calendar year
$75
   Six or every subsequent false alarms in any calendar year
$100
 
(2005 Code, § 50.02) (Ord. 1998-9, passed 9-8-1998)
   (D)   Title XI: Business Regulations.
 
Code Section
Ch. 115: Taxicabs
Fee
Fees
 
   Annual license fee
$5
   Additional annual fee for each taxicab licensed through the service
$1
 
(2005 Code, § 44.05)
 
Code Section
Ch. 116: Solicitors; Itinerant Merchants and Peddlers
Fee
Charitable solicitor application fee
$25
116.32(A)(1)
Itinerant merchants, solicitors and peddlers application filing fee
$25
Itinerant merchants, solicitors and peddlers license fee
$100 (per year)
 
(2005 Code, §§ 41.09, 43.05) (Ord. 2006-5, passed 6-19-2006)
   (E)   Title XV: Land Usage.
Code Section
Ch. 151: Building Regulations; Construction
Fee
Code Section
Ch. 151: Building Regulations; Construction
Fee
151.09(D)(1)
Building Permit Fees
 
 
New Construction and Additions
 
 
Type of Construction
Permit Fee
 
   1- or 2-family dwelling detached
$120 + $0.05 per sq. ft. over 2,000 sq. ft.
 
   Accessory building (residential use)
$40
 
   Apartments, hotels, motels-each unit
$80
 
   Business, commercial, industrial, public
$160 + $0.05 per sq. over 2,000 sq. ft.
 
   Educational, institutional, church
$120 + $0.05 per sq. ft.
 
   Mobile home, or temporary structures
$40
151.09(D)(2)
Electrical permit fees
 
 
   Electrical permits issued and obtained prior to commencement of the work for which such permit is required, the following fees shall be levied, with a minimum permit fee being $20
 
 
   Additional final inspection, each
$50
 
   Circuits, each (new or replaced)
$3
 
   Horsepower (machinery)
 
 
      First hp
$7
 
      Each additional hp
$0.25
 
   Reset and reconnect, each
$15
 
   Reinspection fee, each
$25
 
   Switchboards and panel boards each (new and replaced)
 
 
      60 amp
$5
 
      100 amp
$7
 
      200 amp
$9
 
      400 amp
$12
 
      600 amp
$15
      Over 600 to 2,000 amp
$20
 
      Over 2,000 amp
$25
 
   Temporary services (all amperage)
$7
151.09(D)(3)
Plumbing permits
 
   For plumbing permits issued and obtained prior, to commencement of the work for which such permit is required, the following fees shall be levied, with a minimum permit fee being $20
 
   Additional final inspection, each
$50
   Backflow protection, each
$5
   Building sewer, each
 
      Under 100 ft.
$10
      100 ft. or over
$20
   Building water, each:
 
      Under 100 ft.
$10
      100 ft. or over
$20
   Drain within building for rain water systems, each
$4
   Drywells, each
$10
   Each gas piping system of 1 to 4 outlets
$3
   Each gas piping system of 5 or more, per outlet
$1
   Each plumbing fixture or trap or set of fixtures on one trap, including water and drainage piping therefor
$4
   Fire protection sprinkler system:
 
      Up to 30 heads
$20
      Plus each additional 10 heads thereafter up to 500
$5
      Plus each additional 50 heads over 500
$5
   Gas reconnection, each
$15
   Gas tanks and pumps
$10
   Industrial waste pretreatment interception, including its trap and vent, excepting kitchen-type grease interceptors functioning as fixture traps, each
$7
   Installation, alteration or repair of water piping and/or water treating equipment
$5
   Lawn sprinkler system on any one meter, including backflow protection devices thereof each
$5
   Reinspection, each
$25
   Repair or alteration of drainage or vent piping
$5
   Trailer park sewer, each
$9
   Water heater and/or vent, each
$6
   Water softener, each
$6
151.09(D)(4)
Heating and air conditioning permits
 
   For heating and air conditioning permits issued and obtained prior to commencement of that work for which such permit is required, the following fees shall be levied for, with a minimum permit fee being $20. When the total capacity of any system in any single installation is provided by more than one unit, the sum of the capacities of each, unit and the total number of such units shall determine the fee
 
   Air conditioning:
 
      Central, electric:
 
         Less than 5 tons:
 
            First unit
$15
            Second unit
$10
         5 to 10 tons
$25
         Over 10 tons
$40
   Air handlers
 
      400 CFM to 2,500 CFM
$25
      Over 2,500 CFM
$60
   Boilers, steam or hot water
 
      Up to 300,000 BTUs
 
         First unit
$20
         Each additional unit
$15
      300,000 BTU or more
$50
   Duct and register, change fee
$15
   Each additional final inspection
$50
   Each reinspection fee
$25
   Electric furnaces (air handling)
 
      Less than 100 kw input:
 
         First unit
$15
         Second unit
$10
      100 kw input or more
$25
   EMI air blowers
$15
   Gas reconnection, each
$15
   Gas piping (distribution of piping to equipment) to be included on permit application:
 
      Each gas piping system of 1 to 4 outlets
$3
      Each gas piping system 5 or more, per outlet
$1
   Heat pumps
 
      1,000 to 60,000 BTUs input
 
         First unit
$15
         Each additional unit
$10
      60,000 to 300,000 BTUs input
 
         Up to 7-1/2 tons, each
$40
         7-1/2 tons or more, each
$75
      Earth, coupled water source
$50
   Incinerators
 
      5 cubic fee or less
$10
      More than 5 cubic feet
$10
      (Plus $1 or each foot in excess of 5 cubic feet)
 
      Maximum fee
$75
   Oil and gas conversions
 
      Up to 300,000 BTU input:
 
         First unit
$15
         Second unit
$10
      300,000 BTU input or more
$25
   Refrigeration and engine-drive, gas-fired or oil-fired cooling equipment
 
      1 to 5 horsepower, each
$15
      6 to 10 horsepower, each
$25
      More than 10 horsepower, each
$40
   Rooftop combination furnace and air conditioning units
 
      Up to 300,000 BTUs, each:
 
      Up to 7-1/2 tons
$40
      7-1/2 ton or more
$60
   Space heaters, each 30,000 BTU input or more
$15
   Through-wall combination air conditioning/heating, VAV boxes with coil
 
      First unit
$10
      Each additional unit
$5
      Solar heat units
$50
   Ventilating and exhaust systems, unit ventilators
 
      Less than 500 CFM capacity
$5
      500 to 1,500 CFM capacity
$10
      (Plus, $1 for each 500 CFM or fraction thereof in excess of 1,500 CFM)
 
   Ventilating commercial hoods:
 
      500 CFM to 1,500 CFM capacity
$25
      Over 1,500 CFM capacity
$50
   Warm-air furnaces, unit heaters, cabinet heaters, radiant tube heaters
 
      Up to 300,000 BTU input:
 
         First unit
$15
         Second unit
$10
      300,000 BTU input or more
$25
   Water chillers
$75
   Woodburning stoves, per flue (including chimney and chimney connector)
$5
151.09(D)(5)
Remolding, alterations and repairs over $1,000 and pool installations
 
Estimated Construction Costs
Permit Fees
   $1,000 - $2,000
$40
   $2,001 and up to $102,000
$40 + $2 per $1,000 of estimated construction cost thereafter up to $102,000
   $102,001 and up
$240 + $0.75 per $1,000 of estimated cost thereafter in excess of $102,000
151.09(D)(6)
Miscellaneous
 
   Each additional re-inspection
$40
   Moving permits
$80
   Sign permits
$40
   Wrecking and demolition permits
 
      Commercial
$40
      Residential
$20
 
(2005 Code, § 120.9) (Ord. 1997-4, passed 10-20-1997; Ord. 2007-1, passed - -2007)
 
Code Section
Ch. 153: Streets and Sidewalks
Fee
Limitations
 
   Cost of any particular new residential or new commercial street, development or improvement
Shall not exceed $20,000
Method of participation
 
 
   Share of the cost to be undertaken by the Town
Cannot exceed $2,000
Permit fee
$50
153.40(B)
Laying, relaying and repair; deposit
$10
 
(2005 Code, §§ 90.02, 90.04, 91.22, 92.07) (Ord. 2001-07, passed 6-4-2001)