Section
General Regulations
156.001 Purpose and intent
156.002 Applicability
156.003 Exemptions
156.004 Exceptions
156.005 Responsibility
156.006 Other relevant permitting
156.007 NPDES Compliance
156.008 Incorporation of figures and standards
156.009 Information accessibility to the public
156.010 Definitions
Stormwater Drainage and Detention
156.025 Drainage plan submittals
156.026 Drainage report
156.027 Drainage conveyance system design criteria
156.028 Design methods
156.029 Detention facilities
156.030 Other drainage requirements
Soil Erosion and Sediment Control
156.045 Purpose
156.046 Scope
156.047 Applicable regulations
156.048 General principles
156.049 Erosion and sediment control plan submittal requirements
156.050 Maintenance of control measures
156.051 Erosion and sediment control inspections and notifications
156.052 Special precautions
156.053 Responsibility
Long Term Maintenance Responsibility
156.065 Maintenance agreement
Inspections
156.080 Inspections
156.081 Special precautions
156.082 Amendment of plans
Permitting
156.095 Application for permit
156.096 Bond required
156.097 Review and approval
156.098 Final certification
156.099 Expiration of approval
Enforcement
156.110 Stop work order; revocation of plan approval
Appendix A: Standard Specifications