Skip to code content (skip section selection)
Compare to:
§ 156.098 FINAL CERTIFICATION.
   Prior to final approval by the city, a registered professional engineer shall certify that detention basin has been constructed in accordance with construction plans and proposed volume has been provided. An “as-built” survey of the detention basin prepared by a state licensed surveyor shall be included with the certification for approval.
(Ord. 2017-03, passed 3-6-2017)