Loading...
§ 153.067  PLANNING BOARD REVIEW.
   (A)   The Building Inspector shall transmit the proposed park plan to the Chairperson of the Planning Board for review at its next meeting.
   (B)   (1)   The Planning Board shall review the proposed plan to determine if it is in accordance with the above requirements and the applicable zoning requirement. If the Planning Board should disapprove the proposed park plan, the reasons for such action and recommended changes shall be given to the developer or his or her agent.
      (2)   After the Planning Board has approved conditionally the proposed park plan, one approved copy shall be sent to the Building Inspector and one approved copy shall be given to the developer or his or her agent.  The developer or his or her agent shall then obtain approval from the County Health Department and the County Electrical Inspector.
(1993 Code, § 91.067)  (Ord. passed 4-6-1981)
§ 153.068  ACCESS.
   (A)   The proposed access to the park shall conform to the standards of the State Department of Transportation.
   (B)   The developer or his or her agent must obtain approval of the District Highway Engineer of the State Department of Transportation  prior  to  beginning construction.
   (C)   If the District Highway Engineer requires any change in access, the developer or his or her agent shall resubmit the proposed plan to the Planning Board for its further approval prior to beginning construction.
(1993 Code, § 91.068)  (Ord. passed 4-6-1981)
§ 153.069  WATER AND SEWER.
   (A)   If town water and sewer is to be provided to the mobile home park, it shall be designed and constructed so as to be compatible with the existing town system of water distribution and sewage disposal. Any extension of lines from existing town lines shall be at the expense of the developer, including any lift stations or other requirements which may be required by the town.
   (B)   If a community water or sewer system is to be provided, the County Health Department and if necessary, the Division of Health (Department of Human Resources) and the Environmental Management Commission, shall review the plan and determine if it is in accordance with their health  standards and regulations in  the following particulars:
      (1)   Source of water and water distribution system;
      (2)   Sanitary sewage disposal and treatment system;
      (3)   Adequate lot size, if septic tanks are to be used for sewage disposal and treatment; and
      (4)   Adequate facilities for solid waste storage, collection and disposal.
(1993 Code, § 91.069)  (Ord. passed 4-6-1981)
§ 153.070  REVIEW OF PLAN BY ELECTRICAL INSPECTOR.
   The County Electrical Inspector shall review the proposed park plan to determine if the proposed electrical distribution system is in accordance with electrical codes adopted by the county.
(1993 Code, § 91.070)  (Ord. passed 4-6-1981)
§ 153.071  DEFICIENCIES TO BE CORRECTED BEFORE PROCEEDING WITH DEVELOPMENT.
   If any agency which is required to review the plan finds any deficiencies in the proposed plan, the developer or his or her agent shall correct such deficiencies before proceeding further with development.
(1993 Code, § 91.071)  (Ord. passed 4-6-1981)
Loading...