12.08.070   Obstructions during construction.
   The permit granted pursuant to Section 12.08.010 shall prescribe the date when work shall begin and may include the right to place or cause to be placed upon the street adjacent to the place where the construction, alteration or repair work is to be performed such materials or appliance as may be necessary for use in performing such work; provided, however, that such materials and appliances shall not occupy more than one-third of the roadway in front of said construction work and shall be placed thereon subject to the direction and approval of the city engineer. All materials, debris and appliances shall be so placed as not to obstruct any gutterway and shall be so cared for as to prevent them from being blown or otherwise carried into any catchbasin or any portion of the street other than that lawfully occupied by such obstruction; provided, however, that the city engineer may order such materials, appliances and debris, or any portion thereof, to be removed within three days after written notice, and in the event the same is not removed within the time prescribed by the city engineer, he may cause the same to be removed and charge the costs thereof against the permittee. The placing of materials, appliances and debris upon the street for the purpose of such construction work and the removal thereof shall be held to be a part of such construction work.
(Ord. 1886 (part), 1959: prior code § 33.31. 1959)