913.01 Compliance required.
913.02 Material specifications.
913.03 Jointing processes and approval.
913.04 Rate of infiltration.
913.05 Wyes.
913.06 Residence service lines.
913.07 Lateral sewers.
913.08 Method of tapping.
913.09 Drainage into storm sewers.
913.10 Regulations for sewer line extensions.
913.11 Downspout connections to sanitary sewer prohibited.
913.12 Capacity fee.
913.13 Connection to public sewer required when available.
913.14 Manholes.
913.15 Sanitary force mains.
913.16 Acceptance.
913.99 Penalty.
CROSS REFERENCES
Power to construct sewerage system - see Ohio R.C. 715.40, 717.01
Compulsory sewer connections - see Ohio R.C. 729.06; S. & P.S. 901.06
Management and control of sewerage system - see Ohio R.C. 729.50
Regulations to control house sewers and connections - see Ohio R.C. 719.51
Untreated sewage - see Ohio R.C. 3701.59
Interference with sewage flow - see Ohio R.C. 4933.24
Oil and gas well waste prohibited in sewer - see BUS. REG. 717.25
Sanitary sewer charges - see S. & P.S. Ch. 915