913.08 METHOD OF TAPPING.
   Should it be determined that a tap must be made in a sanitary sewer to provide an outlet for a resident service line, the tap shall be cut with an approved rotary tool and an approved saddle sealed in place with an epoxy cement. Should the tap be of the same size as the sewer being tapped, a section of the sewer shall be removed and a wye branch installed. Either of the above methods shall be backed up with concrete as described in Section 913.05.
(Ord. 640. Passed 7-10-64; Ord. 1583. Passed 9-17-07.)