The approval of permits, plans or drawings and specifications in accordance with this chapter is invalid if construction, erection, alteration, or other work upon the building has not commenced within six (6) months of the approval of the permits, plans or drawings and specifications.
(a) An extension may be granted for a six (6) month period if requested by the owner at least ten (10) days in advance of the expiration of the permit and upon payment of a fee prescribed in fee schedule.
(b) If in the course of construction, work is delayed or suspended for more than six (6) months; the approval of permits, plans or drawings and specifications is invalid.
(Ord. C33-02. Passed 4-15-02; Ord. C110-08. Passed 12-1-08.)
Each permit issued by the Building Division shall be subject to revocation whenever it appears that such building or structure is being so constructed that the same or any part thereof, encroaches upon any street, alley or other public place, or is being so constructed as to violate any of the terms or conditions of the Building Code or any other ordinance of the City of any State statue relating to the location, erection, alteration or repair of buildings. The revocation of the permit shall be in writing and served upon the owner of the superintendent or contractors in charge of the work and posted upon the building or structure for which the permit was granted, and from and after revocation of the permit and the posting of notice, all work of every kind and character on the building or structure shall be discontinued.
(Ord. C33-02. Passed 4-15-02; Ord. C110-08. Passed 12-1-08.)
If during the prosecution of work and subsequent to the issuance of such permit, it is necessary to make any changes in the plans or contract, the permit holder shall notify the Building Division in writing of the proposed changes including a revised site plan, architectural review letter, if required, and construction drawings, along with a fee prescribed therefore in the fee schedule. If approved, the changes shall be added to the original permit file, if the cost of the work is thereby increased so much as to require a higher permit fee, that additional sum shall also be collected in accordance with the fee schedule set herein.
(Ord. C33-02. Passed 4-15-02; Am. Ord. C110-08. Passed 12-1-08.)