CHAPTER 1114
Required Improvements
   EDITOR'S NOTE: All references to "City Solicitor" in this chapter have been changed to "City Law Director" to reflect the Charter Amendment passed by the electors on May 8, 2001, and upon the adoption of Ordinance 2001-96, passed June 4, 2001.
1114.01   Installation or guarantee required.
1114.02   Performance guarantee.
1114.03   Street construction.
1114.04   Sidewalks and handicapped ramps.
1114.05   Sanitary sewers.
1114.06   Water supply.
1114.07   Stormwater drainage systems.
1114.08   Street lighting.
1114.09   Electric and telephone lines; television cables.
1114.10   Monuments.
1114.11   Construction plans.
1114.12   As-built construction drawings.
1114.13   Inspection and escrow account.
1114.14   Subdivider's agreement.
   CROSS REFERENCES
   Construction and repair of sidewalks - see S. & P.S. Ch. 901
   Street construction and repair - see S. & P.S. Ch. 901
   Street excavations - see S. & P.S. Ch. 905
   Standard Construction Drawings - see S. & P.S. Ch. 907
   Sewers - see S. & P.S. Ch. 932
   Underground electrical wiring - see S. & P.S. 941.01; BLDG. 1361.20
   Water supply systems in flood hazard areas - see BLDG. 1323.07
1114.01 INSTALLATION OR GUARANTEE REQUIRED.
   All of the subdivision improvements required under these Subdivision Regulations and delineated on the preliminary plat shall be constructed, or a performance guarantee filed within the time period specified in Chapter 1111.
(Ord. 97-297. Passed 12-15-97.)
1114.02 PERFORMANCE GUARANTEE.
   Before the Planning Commission approves the recording of a final plat, a performance guarantee for the completion of the public improvements required by the project, in an amount established by the City Engineer and in a form approved by the City Law Director, must be provided. Said performance guarantee shall be one of the following:
   (a)   A letter of credit;
   (b)   A performance bond;
   (c)   An escrow bank account; or
   (d)   Such other method approved by the City Law Director.
   Whichever of the above guarantees is provided, such shall be approved by the City Law Director and shall be established for the sole benefit of the City of Elyria, in an amount determined by the City Engineer to be sufficient to pay for the costs of construction or to complete improvements. All engineering costs, including inspection fees, shall also be included in said amount. This amount shall also include provisions for estimated inflation, up to the date stipulated for completion of the improvements.
   Whichever of the above guarantees is selected, it must provide that if the subdivision construction project or improvements are not completed in accordance with all applicable plans and specifications within the time period prescribed by these Regulations, then the full amount, as identified, shall immediately become due and payable to the City, or in lesser amounts from time to time, at the City's option, as may be required for completion according to the approved specifications and the City Engineer.
   For the purposes of this section, a project shall be deemed complete when 100 percent of the required improvements of the subdivision are installed, pursuant to the requirements of these Regulations, and approved by the City Engineer. Release of any guarantee shall be only by the approval of the City Engineer and the City Law Director.
(Ord. 97-297. Passed 12-15-97.)