1114.12 AS-BUILT CONSTRUCTION DRAWINGS.
   Upon completion of construction, reproducible copies of the as-built construction drawings for improvements installed, along with copies of the construction notes and records from which the as-built drawings were made, shall be provided to the City of Elyria. As-built drawings shall include the following:
   (a)   Centerline Profile. The centerline profile (and original ground profile) of each street at a scale of fifty feet or less to the inch, with the final percent of grade indicated.
   (b)   Sanitary Sewers. The plan and profile of all sanitary sewers constructed, indicating the size, grade and all manhole inverts referenced to U.S.G.S. datum, or as may be required. All lateral branches shall be referenced to visible permanent physical features, as to location, and the length, as required by the Safety-Service Director. Indicating the depth of sanitary sewers shall be optional and may be provided from the developer, if available.
   (c)   Stormwater Drainage Systems. The plan and profile of all storm sewers and detention basins constructed, indicating the size, grade and all manholes, inlets, headwalls and culvert invert elevations referenced to U.S.G.S. datum, or as may be required. All storm laterals, where required, shall be referenced to visible permanent physical features, as to location, and the length, as required by the Safety-Service Director. Indicating the depth of the stormwater drainage system shall be optional and may be provided from the developer, if available.
   (d)   Water Distribution Systems. The plan of all water mains showing the exact locations of all fittings, valves and fire hydrants. All service branches shall be shown, sizes indicated and referenced to visible permanent physical features, as to location, and the length, as required by the Safety-Service Director. Indicating the depth of the water distribution system shall be optional and may be provided from the developer, if available.
(Ord. 97-297. Passed 12-15-97.)