Loading...
The following existing buildings containing a Group R occupancy must be inspected periodically and as often as deemed necessary by the building official:
1. A building with three or more stories above grade plane where the basement contains a dwelling unit or sleeping unit.
2. A building with three or more stories above grade plane with non-residential occupancies on the ground level and residential occupancies above.
3. A building with four or more stories above grade plane.
Written condition assessment reports for existing buildings and existing structures must be prepared and submitted to the building official as provided in Sections 14A-6-603.2 through 14A-6-603.4.
Loading...