All high-pressure boilers which have reached the age of 50 years must be subjected to a full internal and external inspection of rivets, welds, butt straps, shell and/or drums. Findings of such inspection will determine the allowable working pressure of the boiler.
The building official is directed to periodically inspect, or cause to be inspected, signs and sign structures in accordance with Article XIII of Chapter 13-20 of the Municipal Code.
The building official is directed to inspect each building on the list of priority buildings with serious and chronic violations issued pursuant to Section 2-92-416(d) of the Municipal Code at least once within every twelve-month period. After a building is removed from the list, unless the building was placed on the list in error, this requirement continues until no serious violations of the Chicago Construction Codes are found during two consecutive inspections conducted at least six months apart.