Section
General Provisions
54.001 Introduction
54.002 Purpose
54.003 Applicability
54.004 Definitions
54.005 Chapter adoption
Erosion Prevention and Sediment Control for Construction Activities
54.020 Permitting requirements for site development
54.021 Erosion prevention and sediment control (EPSC) plan
54.022 Design requirements for erosion prevention and sediment control
54.023 Best management practices requirements for erosion prevention and sediment control
54.024 Protection requirements for waterways and public storm drains
54.025 City inspections for sediment and erosion control
54.026 Permittee inspections for sediment and erosion control
Illicit Discharge Detection and Elimination (IDDE)
54.040 Prohibitions
54.041 Allowable discharges to MS4
54.042 Documentation of approved connections
54.043 Industrial or construction activity discharges
54.044 Monitoring of industrial/construction activity discharges
54.045 Industrial BMPs required for stormwater discharges
54.046 Accidental discharges
Post-Construction Stormwater Management
54.060 Necessity
54.061 Post-construction stormwater pollution prevention plan requirements
54.062 Post-construction stormwater pollution prevention plan design/performance criteria
54.063 Level 2 permit exemptions
54.064 Private ownership responsibilities and easement requirements
54.065 Public ownership and regional facilities management
54.066 Requirements for long-term operation and maintenance agreements
54.067 Maintenance bonds for post-construction facilities
54.068 As-built requirements
54.069 Qualified professional requirement
Enforcement
54.080 Violations
54.081 Notice of violation
54.082 Appeal of notice of violation
54.083 Stop work order
54.084 Permit suspension or revocation
54.085 Abatement costs
54.086 Remedies not exclusive
54.999 Penalty