(A) Prior to issuance of a certificate of occupancy, recording of the final plat or final release of bond, the as-built condition (including: invert elevations, size, shape, and location) of critical stormwater management features must be identified and approved.
(B) The volume, slopes, configuration, condition and topographic information of all detention, retention and water quality practices shall be certified by a professional engineer or land surveyor, as appropriate, licensed in the Commonwealth of Kentucky. This information shall be provided to the city, in the form of an as-built drawing or other electronic form accepted by the city. The as-built certification shall indicate if final conditions are consistent with, or exceed, the SWQMP provisions.
(C) If it is determined that information provided in the as-built drawing, certification, inspection or survey of the site does not meet or exceed the SWQMP provisions, the city reserves the right to withhold certification of occupancy or final bond release. Furthermore, other enforcement mechanisms may be applied to the permittee or persons making certifying statements.
(D) The requirements of this section only apply for level 2 permits and do not apply for individual residential lot development not part of a larger development.
(Ord. 14-08, passed 9-3-2014; Am. Ord. 19-02, passed 5-6-2019; Am. Ord. 20-05, passed 7-20-2020) Penalty, see § 54.999