Section
General Provisions
155.01 Short title
155.02 Interpretation and purpose
155.03 Definitions
155.04 Required supervision by city for the division of land
155.05 Jurisdiction
155.06 Withholding improvements
155.07 Non-conforming subdivision penalty
155.08 Permits
155.09 Public improvements and municipal services
155.10 Revision of plat after approval
155.11 Requirements for replatting
155.12 General procedures for subdivision
155.13 Annexation
155.14 Conflicting provisions; interpretation
Procedures, Filing, and Specifications for Preliminary and Final Plats
155.25 Filing and filing fee
155.26 Procedures and timing
155.27 Preliminary plat purpose and design intent
155.28 Preliminary plat drawing requirements
155.29 General procedures for final plat
155.30 Final plat drawing requirements
155.31 Construction documents
155.32 Improvements required prior to acceptance of final plat
General Subdivision Design Provisions
155.45 Application
155.46 Streets
155.47 Blocks
155.48 Lots
155.49 Park and school sites
155.50 Approval of final plat in phases by sections
155.51 Maintenance of facilities
Recording and Construction Provisions; Final Procedures
155.65 Recording of final plat
155.66 Submittals required for construction
155.67 Development construction
155.68 Acceptance of the development
155.69 As-built plans
Townhouse and Condominium Development
155.75 Purpose
155.76 Definitions
155.77 General location
155.78 Comprehensive site plan
155.79 Detailed site plan
155.80 Standards and specifications
155.81 Submission of written regulations
155.82 Documents required prior to recording plat
155.83 Refuse collection and storage
155.84 Outdoor storage of property
155.85 Firewall requirements
155.86 Zero lot line regulations
155.98 Conviction not bar to other remedies
155.99 Penalty