(A) Construction documents (hereafter called "plans"), as part of the final plat submittal, shall be prepared by, or under the supervision of, a Registered Professional Engineer in the State of Texas and shall bear his seal on each sheet. The plans shall contain all necessary information for construction of the project.
(B) Each sheet of the plans shall contain a title block including space for notations or revisions. This space is to be completed with each revision to any drawing sheet and shall clearly note the nature of the revision and the date the revision was made.
(C) After review of the plat and accompanying construction documents, the plat shall be submitted to the Board of Commissioners for their consideration. If approved subject to changes, the engineer for the owner shall make all changes required. The City Engineer or his designated representative will approve and return all plans to the engineer of the owner for use by the contractors. Each contractor shall maintain one set of the plans, stamped with city approval, at the project site at all times during construction. If construction has not commenced within one year after approval of the plans, resubmittal of plans may be required by the City Engineer in order to meet current standards and engineering requirements ("Construction" shall mean installation of city maintained improvements or facilities).
(Ord. 445, passed 12-21-87) Penalty, see § 155.99