Prior to authorizing construction, the City Engineer shall be satisfied that the following conditions have been met:
(A) The final plat shall be completed as per city requirements at the time of approval.
(B) All required contract documents shall be completed and filed with the City Manager.
(C) All necessary off-site easements or dedications required for city maintained facilities, not shown on the final plat must be conveyed solely to the city, with proper signatures affixed. The original of the documents, and filing fees, shall be returned to the City Manager prior to approval and release of the engineering plans.
(D) All contractors participating in the construction shall be presented with a set of approved plans bearing the written approval of the City Engineer. These plans shall remain on the job site at all times.
(E) If required by the City Manager or Public Works Director, all parties participating in the construction shall meet for a preconstruction conference to discuss the project prior to beginning work.
(F) A complete list of the contractors, their representatives on the site, and telephone numbers where a responsible party may be reached at all times, must be submitted to the Public Works Director.
(G) Three prints of the utility plan sheet, scale 1 = 100 and ten prints of the same, reduced to 1 = 200, shall be submitted to the Public Works Director, in addition to previous submittal of construction plans.
(H) Manufacturers' drawings for all fabricated appurtenances or special construction items shall be submitted to the Public Works Director.
(Ord. 445, passed 12-21-87)