Section
General Provisions
151.001 Short title
151.002 Statement of findings
151.003 Purpose
151.004 Statutory authority
151.005 Applicability
151.006 Exemptions
151.007 Waivers
151.008 Repealer
151.009 Severability
151.010 Compatibility with other ordinance requirements
151.011 Interpretations
151.012 Definitions
Regulations, Criteria and Standards
151.025 General requirements
151.026 Stormwater management peak rate control
151.027 Volume controls
151.028 Riparian buffers
151.029 Non-structure project design; sequencing to minimize stormwater impacts
151.030 Additional requirements applicable to infiltration oriented stormwater management systems
151.031 Stream bank erosion requirements
151.032 Design criteria for stormwater management facilities and best management practices
151.033 Calculation methodology
151.034 Standards during land disturbance
151.035 Water quality requirements after regulated earth disturbance activities are complete
Site Plan Requirements
151.050 General requirements
151.051 SWM site plan preparation
151.052 Plan submission
151.053 SWM site plan review
151.054 Erroneous permit
151.055 Retention of plans at project site
151.056 Adherence to approved plan
151.057 Modification of plans
151.058 Resubmission of disapproved SWM site plans
151.059 Authorization to construct and term of validity
151.060 As-built plans, completion certificate and final inspection
151.061 Occupancy permit
Inspections
151.075 Schedule of inspections
151.076 Right of entry
Fees and Expenses
151.090 SWM site plan review fee
151.091 Expenses covered by fees
151.092 Itemization of costs
Maintenance Responsibilities
151.105 Performance guarantee
151.106 Maintenance responsibilities; site plan
151.107 Operation and maintenance agreements
151.108 Stormwater management easements
151.109 Municipal Stormwater Maintenance Fund
Prohibitions
151.120 Prohibited discharges and connections
151.121 Roof drains and sump pumps
151.122 Waste disposal prohibitions
151.123 Alteration of SWM BMPs
Enforcement and Penalties
151.135 Right-of-entry
151.136 Inspection
151.137 Enforcement
151.138 Suspension and revocation
151.139 Public Nuisance
151.140 Appeals
151.999 Penalty
Appendix A: Operation and maintenance agreement (O&M)
Appendix B: Stormwater management design criteria
Appendix C: Stormwater Runoff Peak Rate District map
Appendix D: Chapter 93 designated use map
Appendix E: Preliminary site investigation and testing requirements
Appendix F: Low impact development (LID) practices
Appendix G: Nonstructural stormwater management BMPs
Appendix H: Hot spots
Appendix I: Simplified stormwater management procedures for existing single-family dwellings
Appendix J: Impervious hardscaping design and credit criteria
Appendix K: Stormsewer bedding/backfill requirements
Appendix L: References