§ 151.027 VOLUME CONTROLS.
   (A)   (1)   The green infrastructure and low impact development practices provided in the BMP Manual shall be utilized for all regulated activities wherever possible. Water volume controls shall be implemented using the design storm method in division (B) below or the simplified method in division (C) below.
      (2)   This chapter establishes no preference for either methodology concerning regulated activities covering an area equal to or less than one acre that do not require hydrologic routing to design the stormwater facilities, and therefore, in such a situation, the applicant may select either methodology on the basis of economic considerations, the intrinsic limitations on applicability of the analytical procedures associated with each methodology and other factors.
   (B)   The Design Storm Method (CG-1 in the BMP Manual) is applicable to any size of regulated activity. This method requires detailed modeling based on site conditions.
      (1)   Do not increase the post-development total runoff volume for all storms equal to or less than the two-year, 24-hour duration precipitation.
      (2)   For modeling purposes:
         (a)   Existing (pre-development) non-forested pervious areas must be considered meadow in good condition; and
         (b)   One hundred percent of existing impervious area, when present, shall be considered meadow in good condition in the model for existing conditions.
   (C)   The simplified method (CG-2 in the BMP Manual) provided below is independent of site conditions and shall be used if the design storm method is not followed. This method is not applicable to regulated activities with earth disturbance greater than one acre, or for projects that require design of stormwater storage facilities.
      (1)   For new impervious surfaces:
         (a)   Stormwater facilities shall capture at least the first two inches of runoff from all new impervious surfaces;
         (b)   At least the first one inch of runoff from new impervious surfaces shall be permanently removed from the runoff flow; it shall not be released into the surface waters of the commonwealth. Removal options include reuse, evaporation, transpiration and infiltration; and
         (c)   Wherever possible, infiltration facilities shall be designed to accommodate infiltration of the entire permanently removed runoff; however, in all cases at least the first one-half inch of the permanently removed runoff shall be infiltrated.
      (2)   This method is exempt from the requirements of § 151.026.
(Ord. 239, passed 10-14-2020)