Section
1052.01 Permit required; application; fee
1052.02 Authorization and registration required
1052.03 Specifications and requirements
1052.04 Materials; construction; inspections
1052.05 Rules and regulations
1052.06 Privies prohibited
1052.07 Titus-Pitts-Hill Drainage Area (Central Avon Lake Drainage Project (CALDP)); Storm Sewer System Construction Fund
1052.99 Penalty
Editor’s note:
Copies of all legislation pertinent to Chapter 1052 may be obtained, at cost, from the Clerk of Council.
No building sewer shall be constructed to connect with a public sewer, nor shall any connection be made to a public sewer within the city, until the written permission of the Board of Municipal Utilities has been obtained by the person employed to perform the work. An application for a permit shall be signed by the owner, agent or lessee of the property for which the connection is to be made and shall describe the sewer to be connected.
(Ord. 68-59, passed 10-26-1959; Ord. 158-2012, passed 12-17-2012)
Loading...