Skip to code content (skip section selection)
Compare to:
SCHEDULE D
FEE SCHEDULE FOR DAMAGE TO TAPS AND SERVICE CONNECTIONS
   Should a tap or service connection be damaged by an individual, contractor, or other utility, the full cost or repairs shall be charged to those responsible for the damage in accordance with the following:
         1)   During Working Hours shall be the cost of material, plus 100% of labor costs, plus 10% overhead.
         2)   After Working Hours shall be the cost of materials, plus 150% of labor costs, plus 10% overhead.