ARTICLE 5-2: STORMWATER REGULATIONS
Section
General Provisions
   5-2-1   Definitions
Discharges
   5-2-2   Illicit discharges to the stormwater system
   5-2-3   Prohibited nonstormwater discharges
Requirements; Construction Management
   5-2-4   Construction site stormwater management
   5-2-5   Requirement for approved stormwater pollution prevention plans
   5-2-6   Requirement to install and maintain erosion prevention and sediment control measures
   5-2-7   Requirement to control construction and sanitary waste
   5-2-8   Right of entry; construction site inspections
Post-Construction
   5-2-9   Post-construction stormwater management
   5-2-10   Requirement to implement and maintain post-construction stormwater measures
   5-2-11   Right of entry; post-construction inspections
Violations; Enforcement
   5-2-12   Violations