§ 5-2-10 REQUIREMENT TO IMPLEMENT AND MAINTAIN POST-CONSTRUCTION STORMWATER MEASURES.
   Owners of properties must maintain post-construction stormwater management measures to address post-construction stormwater runoff to the stormwater system. These measures may be structural or nonstructural BMPs.
(Prior Document, Ch. 5 Art. II, § 4.02) (Ord. passed - -)