CHAPTER 51:  SEWERS
Section
General Provisions
   51.001   Definitions
   51.002   Owner responsibility for toilet installation
   51.003   Sewer and water connections; general provisions
Prohibitions
   51.015   Depositing objectionable wastes
   51.016   Discharges into natural outlets
   51.017   Privies, septic tanks and other facilities
   51.018   Tampering with or damaging sewer equipment
   51.019   Tap approval required
   51.020   Illegal tap
Private Sewage Disposal System
   51.035   Connecting building sewer to private system
   51.036   Connecting private sewage disposal system to public sewer
   51.037   Maintenance of private sewer disposal system
   51.038   Noninterference with additional requirements
Building Sewers and Connections
   51.050   Permit required
   51.051   Classes of permits; inspection fees
   51.052   Cost and expenses; indemnification
   51.053   Separate building sewer required for every building
   51.054   Use of old building sewers with new buildings
   51.055   Reserved
   51.056   Size and scope
   51.057   Elevation and alignment
   51.058   Artificial lifters
   51.059   Excavations; barricades
   51.060   Location connections
   51.061   Inspection of connections to public sewer
   51.062   Tap-in fee
   51.063   Information required
   51.064   Clean-out required
   51.065   Extension into subdivisions
   51.066   Tap standards
   51.067   Backup; one-way flow check valve required
   51.068   Maintenance from point of tap
Use of Public Sewers
   51.080   Discharge of storm water and other unpolluted waters
   51.081   Discharge of wastewaters or polluted waters
   51.082   Prohibited discharges to public sewers
   51.083   Grease, oil and sand interceptors
   51.084   Preliminary treatment facilities
   51.085   Control manholes
   51.086   Measurement, tests and analyses
   51.087   Special agreements between town and industrial concerns
   51.088   Pretreatment; equalization of waste flows
Rates and Charges
   51.100   Establishment of rates and charges
   51.101   Monthly billing
   51.102   Determination of charges by town
   51.103   Charges based on strength and character of discharges
   51.104   Cost studies for user classes
   51.105   Penalty write-offs
Industrial Cost Recovery
   51.120   Definitions
   51.121   Cost recovery charges
   51.122   Users subject to cost recovery charges
   51.123   Determining rates
   51.124   Establishment of fund
   51.125   Sewage records review
   51.126   Billing requirements
Administration and Enforcement
   51.140   Right of entry for inspections
   51.141   Enforcement of bylaws and regulations
 
   51.998   Violations
   51.999   Penalty
Statutory reference:
   Municipal sewage works, see I.C. 36-9-23-0.1    through 36-9-23-37